Trend Sports EUROBUNGY Скачать руководство пользователя страница 18

 

Standard Operating Procedure 

Attraction:  EUROBUNGY-TRAMPOLINE 

 

August 

2011 

Policy: Standard Operating Procedures Manual 

Approved: Peter Raidt 

 

Page 18 of 39 

Steel/Alu Trampolines 

 
Always make sure that the springs of the steel/alu framed trampolines are covered 
with the soft protector to prevent any injuries.  

The suspension system is half of the fun in using the “EUROBUNGY-TRAMPOLINE” but the 
jumper needs to be very careful on it as well.  This means that the instructor needs to always be 

aware of the jumper and his/her placement on the trampoline.  The jumper should try to stay in 
the center of the trampoline for maximum stability and height.   
 

The instructor should not allow anyone else besides the jumper on the trampoline 
while the “EUROBUNGY-TRAMPOLINE” is in use. Always make sure that the jumper 
enters the steel trampoline using the access steps.  These Steps should always be 
checked about their correct and safe positioning. 
Wind 

 
Air Tramps 

 
In hot weather the air tramps has to be deflated to avoid any leaking of the sealed unions. 

To test if there is enough air inside the trampoline tubes, jump on the canvas without elastics 
and if you do not hit the floor, it’s tight enough. To test not having to much air in the tubes, 
press lightly against the PVC material. If you can not bump in at least 2”, release some air. 

 
Banners 

 

If your EUROBUNGY is equipped with banners please read this chapter. 
The  banners do not resist to big thunderstorms. In case of heavy weather conditions they can 

be destroyed by the wind. The construction itself is proofed for 75mph, the banners up to 
45mph. 

You may not operate the EUROBUNGY with winds exceeding 45mph. 
On the new EUROBUNGY model 2005, the banners can be taken off with the short 130.5” long 

cables. 

 

6.

 

Fence 

 

The EUROBUNGY can be  fenced in.  
During Non-Operation and Operation Hours to pretend unauthorized access. 

 
9.

 

PERFORMING A SAFETY CHECK 

 

The supervisor opening the attraction in the morning will conduct a Maintenance inspection. All 

operating equipment and  EUROBUNGY-TRAMPOLINE systems are inspected on a daily basis 
prior to operations.  There is no exception to this rule.  Supervisors must complete the inspection 

on the  EUROBUNGY-TRAMPOLINE systems.  Any problems encountered must be reported to 
supervision and park maintenance personnel if necessary immediately before the inspection is 
completed. 

 
It is imperative that every harness, karabiner, and all other operating equipment is inspected.  

Supervisors will use the Daily Inspection form to record their inspection.  Once the equipment 
has been inspected and verified, the supervisor should complete the Daily Inspection Form. 
 

 

Check steel frame trampolines for security and be sure soft protectors cover springs  

Содержание EUROBUNGY

Страница 1: ...EUROBUNGY TRAMPOLINE STANDARD OPERATING PROCEDURE EUROBUNGY Standard Operating Procedures...

Страница 2: ...y The information contained herein is proprietary and is owned in its entirety by EUROBUNGY This manual is to be used exclusively by authorized associates of EUROBUNGY and is protected pursuant to the...

Страница 3: ...please feel free to ask questions at any time during your training Remember to always be thinking SAFETY while operating EUROBUNGY TRAMPOLINE This manual has been designed to help you understand this...

Страница 4: ...the attraction noises procedures nuances and any changes in its operation or surroundings will be quite apparent to you Notify your supervisor should you notice a change in the way the attraction oper...

Страница 5: ...Hoist Rope During times the Ride is not set up the Rope must be stored in a place where they can not be kinked any how The jumper rope and winch rope comes normally with sewn Loop ends Nevertheless a...

Страница 6: ...unning smoothly and freely through the pulleys and the hoist Should the ropes become entangled worn or damaged discontinue their use Take corrective action before allowing anyone else to ride g Operat...

Страница 7: ...ng immediately Only vertical movements are allowed Do NOT land with head or shoulders on the trampoline No hard soled shoes or heels allowed Operators are not responsible for lost or damaged items lef...

Страница 8: ...may deny entry to the EUROBUNGY to any person if in the opinion of the owner operator the entry may cause above normal exposure to risk of discomfort or injury to the person who desires to enter or if...

Страница 9: ...GUESS 15 The Operator must have been trained according this Manual 8 EUROBUNGY TRAMPOLINE ELEMENTS 1 HARNESSES The EUROBUNGY HARNESS is the actual link the restraint system between the jumper and the...

Страница 10: ...nd left readjust the harness If the jumper does not fit in any of the harnesses do not use the EUROBUNGY TRAMPOLINE The harness should fit the jumper tightly but not so tightly that it is uncomfortabl...

Страница 11: ...it can not travel along the winch rope or if it is a new Limit Disk without any screws just use two zip ties on each side of the disc to fix its location This avoids that any operator can pull the ro...

Страница 12: ...and jumper rope So far the configuration was as following Harness carabiner elastics carabiner swivel jumper rope Now we recommend the following Harness swivel carabiner elastics carabiner jumper rope...

Страница 13: ...to increase the number of elastics Also the capability of the jumper increases or decreases the numbers of elastics you have to put on LOOPS You have 10lbs 20lbs and 40lbs elastics we call them A B C...

Страница 14: ...greatly with the individual abilities of the jumper This effect becomes more pronounced at the upper end of the weight scale as it goes almost unnoticed at the lower weight classes Use the higher num...

Страница 15: ...each end of the elastic into one hand Then twist one elastics s tail end 10 times before knotting it The tape knot as its name suggests is used to tie the ends of tape webbing together usually into a...

Страница 16: ...GY TRAMPOLINE August 2011 Policy Standard Operating Procedures Manual Approved Peter Raidt Page 16 of 39 Starting from the free end retrace the original knot with the second piece of tape Continue ret...

Страница 17: ...be straight and able to move freely through the pulleys Stop the operation immediately if any of the mentioned criteria is in malfunction 5 SUSPENSIONS TRAMPOLINES The suspensions are the elements of...

Страница 18: ...he PVC material If you can not bump in at least 2 release some air Banners If your EUROBUNGY is equipped with banners please read this chapter The banners do not resist to big thunderstorms In case of...

Страница 19: ...points ensuring that the pulleys work properly with no excessive wear the swivels work properly and they swivels have their safety pins in Check the hoist and its rope thoroughly Check the ropes for...

Страница 20: ...to harness and EUROBUNGY TRAMPOLINE structure Cashier trained and certified staff member responsible only for selling tickets and weighing participants Cashiers may not secure or jumpers or operate a...

Страница 21: ...a ride is operating or while a non operational location is not fully locked out Limited Contact Policy The limited contact policy is in place to prevent you from having unnecessary contact with guests...

Страница 22: ...g listing install dates of the Powercords LOOPS Daily Inspection Log A supervisor must complete a Daily Inspection Log at the beginning of each day The Elastic Log is located in Appendix A at the end...

Страница 23: ...h all additional positions staffed up to 4 people plus one cashier may be assigned to operate the attraction simultaneously The following is a list of those positions and the general duties of each CA...

Страница 24: ...within the weight restrictions 2 Ensure the guest is at the correct jump station for his or her weight class or adjust elastic combinations as required If you have to add on or hook off elastics do t...

Страница 25: ...ure and that the jumper is comfortable If the jumper does not fit in any of the harnesses do not operate attraction 9 The harness should fit the jumper tightly but not so tightly that it is uncomforta...

Страница 26: ...wn in a straight line without swinging back and forth 5 Release the UP button when the jumper reaches optimum height At reaching optimum height the jumper is free to do somersaults Optimum height is r...

Страница 27: ...eds to be stopped from swinging before he or she is lowered and then readjusted according to a higher weight class Never lower a jumper toward the trampoline when they are still swinging To stop a jum...

Страница 28: ...ance should you lower the hoist to the point that the rope leading into the hoist is excessively slacked Failure to be aware of this could result in serious damage to the rope 4 Once the jumper is sta...

Страница 29: ...ntenance assistance 3 Maintenance if requested and supervision will assess the situation and determine if the attraction will remain in operation 4 If a problem develops that poses an immediate threat...

Страница 30: ...UNGY TRAMPOLINE does not operate in the rain The rain can damage the equipment as well as risk the safety of the guests 1 When it starts to rain stop all jumpers 2 The trampolines get very slick when...

Страница 31: ...ed out before the end of the shift 2 Major fire A major fire is one in which there is a severe danger to guests crewmembers or equipment exists a The person in charge of the attraction must be notifie...

Страница 32: ...temporarily closed due to minor difficulties without disclosing specific details NOTE Depending on the length of time necessary to reopen the attraction the queue line may be evacuated Only the superv...

Страница 33: ...n EVACUATING THE ATTRACTION 1 Remain calm and reassure our Guests that we have the situation under control 2 Lower any jumpers quickly following all normal unload safety procedures 3 Direct jumpers to...

Страница 34: ...r moves toward center of the jump apparatus to operate the hoist assembly to raise jumper As soon as Powercords are tensed operator directs jumper to begin jumping while gradually raising the jumper i...

Страница 35: ...will be still possible The weight Chart will vary the more elastics inside are broken The Powercords should be retired if the cloth is severely damaged or the elastics inside are broken by more than...

Страница 36: ...ardware CARABINERS SWIVELS AND PULLEYS All Alu carabiners open and close properly Wear on carabiners swivels and pulleys Functional tests of carabiners swivels and pulleys Rope passage through pulleys...

Страница 37: ...UNGY TRAMPOLINE POWERCORD LOOP ELASTICS LOG INSTALLED RETIRED INSTALL DATE 10lbs 20lbs 30lbs RETIRE DATE 10lbs 20lbs 30lbs The elastics should be replaced regularly for optimal use and safety If at an...

Страница 38: ...er weighs 60lbs put one elastics for 50lbs g Choose the right size of harness for the jumper s weight Small harnesses are from 20lbs to 100lbs and large harnesses fit from 75lbs to 200lbs If you have...

Страница 39: ...around and lower down jumper 1 Before doing so must tell the jumper Please stop bouncing time is up I let you down While doing so monitor the 2nd jumper and give help if necessary You can give a jumpe...

Отзывы: