Installation
(for qualified installers only)
7
© Travis Industries
4090709
100-01222_000
Packing List
•
Propane Conversion Kit
•
Log
Set
•
Firestop (sku 250-00747)
Additional Items Required
•
Direct
Vent
•
Gas Line Equipment (shutoff valve, pipe, etc.)
•
Electrical Equipment
Installation Overview
•
All requirements below must be met.
See the section
"Approved Vent
Configurations"
See the section
"Electrical Connection"
See the section
"Mantel Requirements"
Insulation must not fill
the 1/2" (13mm)
clearance around the
back and sides of the
fireplace.
See the section
"Vent Requirements"
See the section "Minimum
Framing Dimensions"
Drywall
Top Vent
Configuration
Rear Vent
Configuration
See the section
"Gas Line Installation"
Side
Wall
See "Optional Non-
Combustible Facing"
Drywall
See "Optional Non-
Combustible Hearth"
Nailing Brackets
Required Travis
Firestop (sku
250-00747)
1" Min.
25mm
Recommended Installation Procedure
•
Frame the opening for the fireplace. Make sure to allow for vent installation.
•
This fireplace is designed to accommodate 1/2" (13mm) or 5/8" (16mm) drywall (see "Nailing
Brackets" on page 14 for details). Secure the fireplace to the framing.
•
Install the vent, gas line and electrical hook-up.
•
Install the drywall.
•
Install the hearth (if applicable).
•
Install the facing (if applicable).
•
Install the mantel (if applicable).
•
Finalize the installation (see page 43) and install the grill or face.