background image

13

© Transtector 2017.  All Rights Reserved.

Outputs

22.  The AC Edge power panel outputs consist of 6 IEC 320-C13 connectors per phase.  The panel accepts 2 feeds at 240Vac each 

with dedicated neutrals.  Output positions accept standard IEC 320-C14 connectors (see Figure 5).

23.  Connect opposite ends of output conductors to the output loads and label all wiring for clear identification.
24.  Turn off or disable fuses, breakers, or other disconnect devices feeding power to the AC Edge panel. 

 

Note: The following steps deal with breakers.  Good practice involves turning off power to the panel when installing or replacing 

breakers.  When that is not possible, rely on and follow established operating company or regulatory practices.  However, NEVER 

install breakers in a live circuit with the operator handle switched on.

25.  Remove blank cover over selected breaker position.  Pull the handle of the blank cover to remove.  See “Breaker Replacement” 

on Page 14.

26.  During installation of breakers, ensure that circuit breakers are switched off.
27.  Install circuit breakers in the “off” position, with ON letters oriented towards the top of the unit and OFF towards the bottom.
28.  When installing breakers, record the ratings and position on the designation card shown in Accessory Kit (see page 8).  Insert 

card into slot below breakers.

29.  Disable AC Edge output loads at the equipment.
30.  Turn on output breakers.
31.  Turn on or enable fuses, breakers, or other disconnect devices to feed power to the AC Edge unit.
32.  Verify that the PWR LEDs are on (green), FA (fuse alarm) LEDs are off, and surge module LED is on (green) for powered line and 

off if not powered.

33.  Turn off one of the breakers.  Expect that the FA (fuse alarm) LED is on (red).

Check the FA (fuse alarm) terminals on the rear of the panel.  Expect:
• 

An open circuit (∞) between C and NC, and

•  Continuity (0 Ohms) between C and NO.

34.  Make sure all breakers are on.
35.  Test power and polarity at the input of each output load.
36.  Enable AC Edge ouput loads at equipment.  Check loads for proper operation.

Installation Procedure cont.

Figure 5: IEC 320-C13 output positions and alarm connection

Содержание AC Edge 240

Страница 1: ...Installation Manual 1101 1173 M REV H AC Edge 240 Dual Phase 60A 6 6 AC Power Distribution Unit Model AC240V60DF 6 6 P N 1101 1173...

Страница 2: ...on Procedure Inspect Shipping Container Inspect Contents of Container Accessory Kit Installing Mounting Brackets Mounting Panel to Rack Ground Wiring Input Wiring Test Voltages and Alarms Outputs Brea...

Страница 3: ...front of the panel contains six LEDs One on each line labeled PWR the LED is green when power is supplied to the unit and off when no power is supplied One on each line for tripped breaker indication...

Страница 4: ...A output per phase and 10 A per output position L1 input feeds L1 outputs L2 input feeds L2 outputs Breaker Output Current 1 A to 10 A single pole hydraulic magnetic non delay slow trip breakers sold...

Страница 5: ...7 kg Weight shipping 20 lbs 9 kg Chassis Dimensions Nominal without rack mounting brackets 3 47 H x 17 4 W x 13 5 D 88 mm x 442 mm x 342 mm Rack Mounting 2RU 19 per EIA Standard RS 310 D optional 23...

Страница 6: ...priate consideration of equipment nameplate ratings should be used when addressing this concern Reliable Earthing Reliable earthing of the rack mounted equipment should be maintained Particular attent...

Страница 7: ...carrier s representative be present during unpacking Note Transtector is not liable for damages incurred during shipping Inspect Contents of Container 2 During unpacking inspect panel for damage If d...

Страница 8: ...Installation 8 Flat Washer 12 Panel to Rack Installation 4 Lock Washer 12 Split Panel to Rack Installation 4 Screw 12 24 x 5 Pan Head Phillips Panel to Rack Installation 4 19 Mounting Bracket Rack Mo...

Страница 9: ...kg Take care to support the panel when installing panel to rack Two persons may be required in the following step 9 Mount panel to rack using two sets of supplied fasteners per side total of four 12 2...

Страница 10: ...ound lug The ground lug is located just left of the access panel shown in Figure 3 12 Fasten lug to panel using the provided M6 KEPS nuts and flat washers Tighten to 50 55 inch pounds 6 2 Newton meter...

Страница 11: ...position and NEUTRAL 2 to the 2nd position from the bottom of the input terminal block see Figure 4a and 4b To secure wires follow figure 4a 1 Strip wire to 18mm 0 70in 2 Fully insert wire into termi...

Страница 12: ...L1 Power Alarm NC 10 L1 Suppression Status NO 3 L2 Power Alarm NO 11 L2 Suppression Status NC 4 L2 Power Alarm NC 12 L2 Suppression Status NO 5 L1 Fuse Alarm NO 13 Common 6 L1 Fuse Alarm NC 14 Common...

Страница 13: ...installation of breakers ensure that circuit breakers are switched off 27 Install circuit breakers in the off position with ON letters oriented towards the top of the unit and OFF towards the bottom...

Страница 14: ...and free the breaker see Figure 6 Figure 6 Removing a breaker Circuit Breakers The AC Edge 240 panel is compatible with single pole Carling Technologies M Series or AIRPAX SNAPAK series hydraulic magn...

Страница 15: ...15 Transtector 2017 All Rights Reserved Dimensions...

Страница 16: ...AWG YAV10 2TC14 8 AWG YA8CL 2TC14 LCD8 14A L 6 AWG YA6CL 2TC14 LCD6 14A L 4 AWG YA4CL 2TC14 LCD4 14A L 2 AWG YA2CL 2TC14 LCD2 14A Q Maintenance AC Edge 240 panels require no scheduled maintenance Ser...

Страница 17: ...duct Transtector conveys no license under its patent rights or those of others Transtector reserves the right to change this product and this publication without notice Transtector Systems Inc 10701 A...

Отзывы: