4.28 OB/GYN Stretcher Foot Support Gas Spring
Chapter 4: Removal, Replacement, and Adjustment Procedures
Page 4 - 90
TranStar® PC-100/PC-200/PC-300/PC-350/PC-400/PC-450/
PC-500/PC-550/TR-500/SG-500/OB-450/OB-550/EL-550
Series Stretcher Service Manual (man115re)
d. Rotate the foot support gas spring (B) clockwise or counterclockwise in
half-turn increments to adjust.
e. Loosely install the shoulder bolt (C).
f.
Check the operation of the foot support push release lever again, and
repeat the adjustment procedure for the foot support gas spring (B) (if
necessary).
g. When the foot support push release lever is functioning properly, install
the locknut (D) located at the bottom of the foot support gas spring (B).
h. Using the adjustable wrench, tighten the jam nut (K).
5. Place the foot support bellow (A) into position.
6. Using the ratchet and T25 Torx® head bit, install the two screws (H)
securing the mattress retainer (I) to the foot rest weldment (E)
(see figure 4-45 on page 4-87).
7. Using the ratchet and T30 Torx® head bit, install the four screws (F)
securing the foot support bumper/handle (G) to the foot rest weldment (E).
8. Install the new ratchet fastener (J).
9. Replace the foot section, and mattress assembly to complete the
replacement procedure.
Содержание EL-550
Страница 2: ......
Страница 509: ...Schematic Wiring Diagram Control Board P N 49603 Back to Chapter 3 ...
Страница 510: ...Schematic Wiring Diagram Electric Stretcher P N 60389 Back to Chapter 3 ...