VAV-SVN03A-EN
58
At the VariTrac Central Control Panel, the communication link wires must be
connected to Terminals TB2-10 (+) and TB2-11
(−
). Refer to Figure 26. This
connection is polarity sensitive.
IMPORTANT
Connections between lengths of link wiring should be soldered and taped.
Wire nuts are not acceptable.
CAUTION
Connecting the communication link with reversed polarity will lead to
system malfunction and possible equipment damage.
The shield on the communication link wiring must be connected to TB2-12.
The shield wire should be spliced with the shield from the next section of
communication link wiring at every junction. Tape each splice to prevent any
contact between the shield and ground. The shield should be cut and taped
back at the end of the link.
Communication link wiring cannot pass between buildings.
IMPORTANT
Improper communication link shield connections will lead to system
malfunction.
IMPORTANT
Improper communication link routing will lead to system malfunction.
Connect UCMs on the communication link in a daisy-chain configuration.
With this configuration, it is easier to solve communication problems by
isolating portions of the communication link. See Figure 25 for an example
of a daisy-chain configuration.
Getting Started
Содержание VariTrac VAV-SVN03A-EN
Страница 1: ...Installation Manual VariTrac Central Control Panel June 2002 VAV SVN03A EN...
Страница 52: ...VAV SVN03A EN 46 System Start Up and Checkout...
Страница 58: ...VAV SVN03A EN 52 Tests andTroubleshooting...
Страница 68: ...VAV SVN03A EN 62 Getting Started...