![Trane RTAD 085 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/trane/rtad-085/rtad-085_installation-operation-and-maintenance_1149696002.webp)
RTAD-SVX01F-E4
©American Standard Inc. 2006
Foreword
These instructions are given as a
guide to good practice in the
installation, start-up, operation, and
maintenance by the user, of Trane
RTAD chillers. They do not contain
full service procedures necessary for
the continued successful operation of
this equipment. The services of a
qualified technician should be
employed through the medium of a
maintenance contract with a
reputable service company. Read
this manual thoroughly before unit
start-up.
Units are assembled, pressure
tested, dehydrated, charged and run
tested before shipment.
Warnings and cautions
Warnings and Cautions appear at
appropriate sections throughout this
manual. Your personal safety and the
proper operation of this machine
require that you follow them
carefully. The constructor assumes
no liability for installations or
servicing performed by unqualified
personnel.
WARNING! Indicates a potentially
hazardous situation which, if not
avoided, could result in death or
serious injury.
CAUTION! Indicates a potentially
hazardous situation which, if not
avoided, may result in minor or
moderate injury. It may also be used
to alert against unsafe practices or
for equipment or property-damage-
only accidents.
Safety recommendations
To avoid death, injury, equipment or
property damage, the following
recommendations should be
observed during maintenance and
service visits:
1. The maximum allowable pressures
for system leak testing on low and
high pressure side are given in the
chapter "Installation". Always
provide a pressure regulator.
2. Disconnect the main power supply
before any servicing on the unit.
3. Service work on the refrigeration
system and the electrical system
should be carried out only by
qualified and experienced
personnel.
Reception
On arrival, inspect the unit before
signing the delivery note.
Reception in France only:
In case of visible damage: The
consignee (or the site representative)
must specify any damage on the
delivery note, legibly sign and date
the delivery note, and the truck
driver must countersign it. The
consignee (or the site representative)
must notify Trane Epinal Operations -
Claims team and send a copy of the
delivery note. The customer (or the
site representative) should send a
registered letter to the last carrier
within 3 days of delivery.
Note: for deliveries in France, even
concealed damage must be looked
for at delivery and immediately
treated as visible damage.
General information