CDHF-SVU01C-EN
68
When less than 5 seconds remain
before compressor start, a starter test
is conducted to verify contactor
states prior to starting the
compressor. The following test or
start sequence is conducted for
‘‘Wye-Delta’’ starters: Also refer to
Figure 24.
A. Test for transition complete
contact open (2A1-J12-2) –160 to 240
msec. An MMR diagnostic will be
generated if the contact is closed.
B. Delay time - 20 msec.
C. Close start contactor (2K1) and
check for no current - 500 msec. If
currents are detected, the MMR
diagnostic ‘‘Starter Fault Type I’’ is
generated.
D. Stop relay (2A1-J10-3 to 1) closes
for one second for test “C” above.
E. Delay time - 200 msec. (Opens
2K1).
F. Close shorting contactor, (2K3) and
check for no current - one second. If
currents are detected the MMR
diagnostic ‘‘Starter Fault Type II’’ is
generated. (Starter Integrity test)
G. If no diagnostics are generated in
the above tests, the Stop Relay (2A1-
J10) is closed for 2 seconds and the
Start Relay (2A1-J8) is closed to
energize the start contactor (2K1). The
shorting contactor (2K3) has already
been energized from (F) above. The
compressor motor (4M1) starts in the
‘‘Wye’’ configuration, an auxiliary
contact (2K1-AUX) locks in the start
contactor (2K1) coil. Additonally,
2K11 pulls in to hold the oil pump
on. This is parallel to 1A7 contacts.
H. After the compressor motor has
accelerated and the maximum phase
current has dropped below 85
percent of the chiller nameplate RLA
for 1.5 seconds, the starter transition
to the ‘‘Delta’’ configuration is
initiated.
J. The transition contactor (2K4) is
closed through relay 2A1-J2, placing
the transition resistors (2R1, 2R2, and
2R3) in parallel with the compressor
motor windings.
K. The shorting contactor (2K3) is
opened through the opening of relay
2A1-J4 100 msec after the closure of
the transition relay 2A1-J2.
L. The run contactor (2K2) is closed
through relay 2A1-J6, shorting out
the transition resistors 260
milliseconds after the opening of the
shorting relay 2A1-J4. This places the
compressor motor in the ‘‘Delta’’
configuration and the starter module
waits to look for this transition for
2.35 seconds through the closure of
the transition complete contacts 2K2-
Aux at module 2A1-J12 input)
M. The starter module must now
confirm closure of the transition
complete contact (2K2-AUX) within
2.32 to 2.38 seconds after the run
relay (2A1-J6) is closed. Finally, the
transition relay (2A1-J2) is opened de-
energizing the transition contactor
(2K4) and the compressor motor
starting sequence is complete. An
MMR diagnostic will be generated if
the transition complete contacts (2K2-
AUX) do not close. A diagram of this
test or start sequence is shown in
Figure 24.
Control Sequence
of Operation
Содержание CenTraVac Duplex CDHE
Страница 1: ...CDHF SVU01C EN X39640670030 Operation Maintenance Duplex CDHF CDHG Water Cooled CenTraVac With CH530 ...
Страница 9: ...9 CDHF SVU01C EN General Information Figure 2 General Duplex unit components 2 stage compressor ...
Страница 23: ...23 CDHF SVU01C EN General Information Figure 16 Oil refrigerant pump circuit 1 or 2 ...
Страница 52: ...CDHF SVU01C EN 52 Control System Components Figure 24 Control panel components layout ...
Страница 53: ...53 CDHF SVU01C EN Control System Components ...
Страница 65: ...65 CDHF SVU01C EN Control System Components ...
Страница 66: ...CDHF SVU01C EN 66 Control System Components ...
Страница 88: ...CDHF SVU01C EN 88 Figure 35 Return CWR Figure 36 Constant CWR Machine Protection and Adaptive Control ...
Страница 104: ...CDHF SVU01C EN 104 ...
Страница 105: ...105 CDHF SVU01C EN ...
Страница 106: ...CDHF SVU01C EN 106 ...
Страница 107: ...107 CDHF SVU01C EN ...
Страница 108: ...CDHF SVU01C EN 108 ...
Страница 109: ...109 CDHF SVU01C EN ...
Страница 110: ...CDHF SVU01C EN 110 ...
Страница 111: ...111 CDHF SVU01C EN ...
Страница 112: ...CDHF SVU01C EN 112 ...
Страница 113: ...113 CDHF SVU01C EN ...
Страница 114: ...CDHF SVU01C EN 114 ...
Страница 115: ...115 CDHF SVU01C EN ...