System Start-Up (Continued)
Table 5-4
Liquid Line & Drier Refrigerant Requirements
Liquid
Liquid
Sporlan
Drier
Line
Line
Part
Refrigerant
O.D.
Charge
No.
Charge
5/8"
1.827
C-305-S
1 lb. - 1 oz.
3/4"
2.728
C-307-S
1 lb. - 1 oz.
C-417-S
1 lb. - 8 oz.
7/8"
3.790
C-307-S
1 lb. - 1 oz.
C-417-S
1 lb. - 8 oz.
1-1/8"
6.461
C-419-S
1 lb. - 8 oz.
Note: Refrigerant charge given in ounces per foot.
Table 5-5
Sample Operator's Maintenance Log
Refrigerant Circuit #1
Refrigerant Circuit #2
Current
Ambient Compr. Suct.
Disch. Liquid Super-
Sub-
Compr. Suct.
Disch. Liquid Super-
Sub-
Temp.
Oil
Press. Press. Press.
heat
cool.
Oil
Press. Press. Press.
heat
cool.
Date
(F)
Level
(Psig)
(Psig)
(Psig)
(F)
(F)
Level
(Psig)
(Psig)
(Psig)
(F)
(F)
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
-
ok -
ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
Note: Check and record the data requested above each month during the cooling season with the unit running.
Содержание CAUC-C80
Страница 5: ...5 General Information Continued Unit Component Layout and Shipwith Locations 120 Ton Unit Illustrated ...
Страница 8: ...8 Figure 3 2 CAUC C80 Unit Dimensional Data Recommended Clearances ...
Страница 9: ...9 Figure 3 2 Continued CAUC D10 Unit Dimensional Data Recommended Clearances ...
Страница 10: ...10 Figure 3 2 Continued CAUC D12 Unit Dimensional Data Recommended Clearances ...
Страница 19: ...19 Installation Continued Figure 3 5 Typical CAUC C80 through D12 Field Wiring Diagram ...
Страница 28: ...28 Figure 5 2 Typical Wiring Schematic for 80 through 120 Ton Units ...
Страница 29: ...29 ...
Страница 30: ...30 Figure 5 3 Typical Control Panel Connections Diagram for 80 through 120 Ton Units ...
Страница 31: ...31 ...
Страница 36: ...36 ...