System Pre-Start Procedures (Continued)
If a leak is encounter, repair the system and repeat the
evacuation process until the recommended vacuum is ob-
tained.
Once the system has been evacuated, break the vacuum
with refrigerant, and complete the remaining “Pre-Start Pro-
cedures" before starting the unit.
Figure 4-1
Typical Vacuum Pump Hookup
Figure 4-2
Evacuation Time-vs-Pressure Rise
200
400
600
800
1000
1200
1400
1600
-10
0
10
20
30
40
50
60
70
80
90
TIME IN MINUTES
PRESSURE IN MICRON
S
Continuously increasing pressure
indicates the presence of leaks,
moisture or both.
State of equilibrium indicates the
true amount of moisture left in
the system. It indicates that no
leaks are present, but further
evacuation is required.
State of equilibrium indicates the
true amount of moisture left in
the system. It indicates that no
leaks are present and the
system is properly evacuated.
Initial evacuation pressure
Содержание CAUC-C80
Страница 5: ...5 General Information Continued Unit Component Layout and Shipwith Locations 120 Ton Unit Illustrated ...
Страница 8: ...8 Figure 3 2 CAUC C80 Unit Dimensional Data Recommended Clearances ...
Страница 9: ...9 Figure 3 2 Continued CAUC D10 Unit Dimensional Data Recommended Clearances ...
Страница 10: ...10 Figure 3 2 Continued CAUC D12 Unit Dimensional Data Recommended Clearances ...
Страница 19: ...19 Installation Continued Figure 3 5 Typical CAUC C80 through D12 Field Wiring Diagram ...
Страница 28: ...28 Figure 5 2 Typical Wiring Schematic for 80 through 120 Ton Units ...
Страница 29: ...29 ...
Страница 30: ...30 Figure 5 3 Typical Control Panel Connections Diagram for 80 through 120 Ton Units ...
Страница 31: ...31 ...
Страница 36: ...36 ...