
60
WSHP-SVX01Y-EN
Figure 71.
Step 10
11. Thread the valve’s wire lead through the low
voltage hole of the heat pump. Refer the figure
below.
Figure 72.
Step 11
12. Wire the valve to the terminal strip according to the
unit wire diagram located on the service control
panel.
RED = 1TB1-14
BLK = 1TB1-18
WHT = 1TB1-15
Figure 73.
Step 12
13. Bundle excess valve wire, and wire tie the bundle
neatly.
Figure 74.
Step 13
14. Install control side service panel.
15. Install the hanging isolation grommets (refer the
figure below) into the hanging brackets The unit
isolators were located in the return-air section of
the unit. See Step 2. Isolators for the economizing
package are located with the economizer.
Содержание Axiom GEH-E035
Страница 116: ...116 WSHP SVX01Y EN Figure 83 GEH_V 6 to 25 tons deluxe 24V 460V 60 Hz 3 ph W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 117: ...WSHP SVX01Y EN 117 Figure 84 GEH_V 6 to 25 tons Tracer ZN524 460V 60 Hz 3 ph W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 118: ...118 WSHP SVX01Y EN Figure 85 GEHE 0 5 to 1 5 tons UC400 W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 119: ...WSHP SVX01Y EN 119 Figure 86 GEHE 2 to 5 tons UC400 W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 122: ...122 WSHP SVX01Y EN N No ot te es s...
Страница 123: ...WSHP SVX01Y EN 123 N No ot te es s...