HDWA-SVX001D-EN
17
N
No
otte
e:: The chiller should remain within its protective
shrink-wrap covering during storage.
Type of Requirement
Trane Supplied
Trane Installed
Trane Supplied
Field Installed
Field Supplied
Field Installed
Foundation
•
Meet foundation requirements
Rigging
•
Safety chains
•
Rigging shackles
•
Lifting beam
Disassembly/Reassembly
(as required)
•
Trane will perform or have
direct on-site supervision
of the disassembly and
reassembly work (contact
your local Trane office for
pricing)
Isolation
•
Isolation pads
•
Isolation pads
•
Optional spring isolators, when required, are
installed by others; do NOT overload springs and do
NOT install isolation springs if they block serviceable
parts such as service valves, etc.
Electrical
•
Circuit breakers
•
Unit-mounted Adaptive
Frequency
™
Drive (AFD)
•
Harmonic filter (optional)
•
Autotransformer
(optional)
•
Temperature sensor
(optional outdoor air)
•
Flow switches (may be
field supplied)
•
Tracer
®
AdaptiView
™
display and mounting
arm
•
Electrical connections to unit-mounted AFD
•
Wiring sizes per submittal and National Electric Code
(NEC)
•
Ground connection(s)
•
BAS wiring (optional)
•
Inter-processor communication (IPC) wiring
•
Control voltage wiring
•
High condenser pressure interlock wiring
•
Chilled water pump contactor and wiring
•
Condenser water pump contactor and wiring
•
Option relays and wiring
Water piping
•
Flow switches (may be
field supplied)
•
Condenser water
regulating valve
controller (optional;
may be field-supplied)
•
Thermometers
•
Water flow pressure gauges
•
Isolation and balancing valves in water piping
•
Vents and drain valves
•
Pressure relief valves (for waterboxes as required)
Pressure Relief
•
Relief valves
•
Vent line and flexible connector
Insulation
•
Insulation (optional)
•
Insulation
Chiller Installation
Completion and Request
for Trane Service,” p. 70
(HDWA-ADF001*-EN;
refer to
)
•
To be completed by installing contractor prior to
contacting Trane for start-up
Chiller start-up
commissioning
(a)
•
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane
®
products
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
•
Move empty refrigerant containers to an easily
accessible point of loading
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane
®
products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.