9
ST1-075A Ia 12/98
Installation of Safety Stand
1.
Sandbagger attachment is filled by operating
host vehicle similar to filling loader buckets
(operator in driver seat). Upon entering sand
material, tilt attachment rearward so that sand
will fall away from leading edge of
attaachment.
2.
Travel to bagging location. Set host vehicle
brakes.
3.
Raise bucket to approximately 4-1/2 ft height.
4.
Tilt bucket forward to bag fill position (bottom
of snadbagger attachment at approximately 45
degrees from horizontal (Figure 8).
5.
With sandbagger attachment installed, the
safety stand combined with sandbag support
must be used when filling sandbags or when
sandbagger attachment is raised and being
held suspended by the host vehicle.
6.
Install stand with sandbag platform pointing
towards the person that will fill the bags.
(Figure 9).
7.
Adjust safety stand to suit height of person
filling bags and then adjust the platform height
to accommodate bag height (Figure 9).
NEVER walk or stand under the raised bucket
when installing safety stand. ALWAYS check
stand for bending and/or deformation before
installation. Always place bent or deformed
safety stand.
!
Warning
All personnel must stand clear of area and
exercise caution while host vehicle is in
motion to avoid any accidents or collisions.
Such a collision could cause injury, death or
property damage.
!
Warning
Removal of Sandbagger
1.
With host vehicle and attachment on level
surface, tilt attachment so that bottom of
attachment bucket is horizontal to surface.
Lower attachment until base is resting on the
ground.
2.
Set host vehicle brakes and shut engine off.
3.
With engine off, move bucket control back and
forth to release all hydraulic pressure withing
control arm cylinders. Leave control in neutral.
4.
Disconnect hoses at quick disconnects located
at host vehicle circuit. Roll up hoses ensureing
covers have been placedn on quick
disconnects.
5.
Reconnect boom or bucket circuit quick
disconnects located at host vehicle
attachment. Use the appropriate lever
considering circuit used.
6.
Remove sandbagger attachment pin lock bolts
(4) and pins (4).
7.
Back host vehicle away from attachment and
align with original loader bucket and install as
per previous instructions (Ref: Installation of
Sandbagger).