![Tractel Tirak Blocstop BSO XE 1020 P Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/tractel/tirak-blocstop-bso-xe-1020-p/tirak-blocstop-bso-xe-1020-p_instruction-manual_1147520008.webp)
8
3. RIGGING INSTRUCTIONS
3.1 GENERAL
3.1.1 Scope
Instructions and advice in this manual exclusively refer
to the following items (see Fig. 4):
–
TIRAK scaffold hoist
with
blocstop
™
BSO secondary brake
or
BS/BSO
1)
secondary brake
;
–
Special TIRAK wire rope
;
–
Power supply cord.
1) Instructions and advice for tirak
™
with blocstop
™
BS/BSO
secondary brake
see seperate instructions
on pages 21 to 34.
Fig. 4 Relevant Items (principle sketch)
Lifeline
Tie-back
Support equip-
ment
Special
tirak
™
wire rope
tirak
™
with
blocstop
™
BSO
Suspended
platform
system
Power
supply
cord
Barricade
Power
supply cord
Special
tirak
™
wire rope
Fig. 5 Typical suspended scaffold installation
Fixing the
wire rope to the
support equipment
Connecting
tirak
™
and
platform system
tirak
™
with
blocstop
™
BSO
secondary brake
3.1.2 Checks before rigging
It is a quali
fi
ed person’s responsibility to check the whole
installation to meet all safety requirements of:
– OSHA regulations and federal, state, provincial or
local safety regulations,
– the proper instructions delivered by the manufactur-
ers of the other pieces of equipment included in your
suspended scaffold installation.
Some pieces are:
– Support equipment including tie-back;
– platform system, work-cage, or bosun’s chair;
– safety equipments (personal fall arrest system);
– barricade below the drop of the platform/work-
cage/bosun’s chair.
NOTE:
This information is
NOT to be considered
as
a complete checklist for your speci
fi
c installation. It
is only a sample list of some general components,
which make part of a typical suspended scaffold
installation (Fig. 5).
Personal
Fall Arrest
System