Site Preparation (new installation)
Proper floor support must be provided. Review the product specification sheet for load require-
ments.
•
Ensure the flooring has adequate support for the bathtub. Verify the sub-floor is level and flat.
•
Consider the installation location. Also make sure the installation area is 3-15/16” (100 mm) lar-
ger than the bathtub on all four sides. For example, the installation area of a 66-15/16” x 29-
1/2” (1700 mm x 750 mm) bathtub should be 74-13/16” x 37-3/8” (1900 mm x 950 mm).
!
Installation
Before You Start
•
Prior to installing inspect the bathtub for damages.
Place the bathtub back into the packaging or use card-
board to prevent damage during the rest of the con-
struction. Leave the protective film on the tub basin. Do not put a ladder or heavy objects inside
the bathtub. Store the tailpiece (boxed separately) in a safe place.
•
Do not use fire (including a lighted cigarette) or have high temperature objects
near the bathtub.
•
Adequately level the sub-floor for proper support of the bathtub.
•
Ensure proper access to the final plumbing locations.
•
All TOTO® Cast Iron Bathtubs are ASME Standard A112.19.1 compliant.
1
2
Level the Bathtub
•
Level the bathtub horizontally. The adjustment legs support the
bathtub. Loosen the locking hex nuts and level the bathtub using
the adjustment hex nuts. The adjustment range is ± 5/16” (8 mm).
•
Turning the adjustment hex nuts will raise or lower the bathtub. Ensure all
locking hex nuts are tightened after the bathtub has been leveled.
3
Maximum gap is
1-3/16” (30 mm).
WARNING: Do not adjust the feet to create
a gap larger than the maximum gap. Serious
injury and/or damage to the legs or feet is possi-
ble.
WARNING: Do not adjust the feet to com-
pletely eliminate the gap. The acrylic skirt may
be compressed by the weight of the cast iron
bathtub and damage may occur.
!
!