background image

Greyline 2000 Series Operator Workstation Hardware Manual

Chapter 6 - Greyline Communication Ports  

••••

  23

PLC Cables

To connect PLCs to the Greyline Operator Workstation, PLC cables are required.  Since different cables
are required for different PLC models, it is recommended that you contact Total Control Customer Service
department for specific cable information.

Port X

Port X is a serial expansion port, and may be connected to a S

ERIES 

T

WO

 device, a serial printer, a host

computer, or a PLC.

This port is configured as a DCE (Data Communication Equipment) port.

Pinout - Port X

The pinout for Port X is illustrated below.

Programming Cable

A programming cable CBL-154 (9 pin or AT) is necessary when downloading to the Greyline.  Connect
the programming cable to Port X and your personal computer, and disconnect when programming is
completed.

               

 

Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Содержание Greyline 2000 Series

Страница 1: ...service in house repair center WE BUY USED EQUIPMENT Sell your excess underutilized and idle used equipment We also offer credit for buy backs and trade ins www artisantg com WeBuyEquipment REMOTE IN...

Страница 2: ...6 LD7 LD8 LD5 LD3 LD4 F6 F4 F5 F7 F8 2 0 1 CLR 4 5 3 SEL ENT ESC 6 PR EV LD1 8 7 9 N EXT Greyline 2000 Series Operator Workstation Hardware Manual 2024 701 Revision D December 1997 Artisan Technology...

Страница 3: ...vailable solely on an as is basis In no event shall Total Control Products Inc be liable to anyone for special collateral incidental or consequential damages in connection with or arising out of purch...

Страница 4: ...ures 5 Introduction to the Greyline Operator Workstation 5 Options 5 10 30 VDC Powered Unit 10VDC 5 230 VAC Powered Unit 230VAC 5 Clock Calendar Chip 6 Main Features 6 Front Panel Features 6 Alphanume...

Страница 5: ...ic Ground 17 115 VAC 19 230 VAC 19 10 30 VDC 19 Chapter 6 Greyline Communication Ports 21 SERIES TWO Devices on a Port 21 PLCs on a Port 21 Port B 22 Pinout Port B 22 PLC Cables 23 Port X 23 Pinout Po...

Страница 6: ...Operator Workstation Hardware Manual This manual provides installation information dimensions connections and specifications In addition this manual introduces the user to the hardware features of the...

Страница 7: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 8: ...reyline Operator Workstation Hardware and Software Manuals Set of Replaceable Legend Sheets Protocol Reference Guides Ten 10 16 x 3 8 Hi Lo Thread Forming Fasteners with Blunt Point 8 required 2 spare...

Страница 9: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 10: ...which feature a Backlit Supertwist LCD display and the 2100 Series which feature a Vacuum Fluorescent display Options The following options may be specified for the Greyline Operator Workstation 1 10...

Страница 11: ...f the Greyline Operator Workstation Below is an illustration of the front panel LD2 F1 F2 F3 LD6 LD7 LD8 LD5 LD3 LD4 F6 F4 F5 F7 F8 2 0 1 CLR 4 5 3 SEL ENT ESC 6 PREV LD1 8 7 9 N EXT Alphanumeric Disp...

Страница 12: ...audible feedback to the user One beep signals a positive acknowledgement and two beeps signal a negative acknowledgement Numeric Function Keys There are four numeric function keys to the right of the...

Страница 13: ...typically reflect the status of a bit in the PLC The LEDs are independent of the function keys Refer to the Greyline Universal Software Manual for further information LD2 LD6 LD7 LD8 LD5 LD3 LD4 LD1...

Страница 14: ...nds of the legend sheets protruding from the unit To replace the legend sheets insert the replacement set into the openings where the original legend sheets were removed If you have problems inserting...

Страница 15: ...B 1 SH EI LD 2 R S 232 TXD B PO R T B 21 RS 422 C TSX R XDB TXD B R XDX TXD X 22 RS 422 C TSX 23 RS 422 TXDX 24 RS 422 TXDX 3 R S 232 R XD X 4 R S 232 R TSX 5 R S 232 C TSX 6 R S 232 D SR X 7 SI G N A...

Страница 16: ...eft of the Program Run Bypass Switch The switches are marked 1 through 8 Refer to Chapter 4 for information on the Dip Switch settings The following illustration depicts the underside of the rear pane...

Страница 17: ...a TSP or Greyline Universal Software configuration matching the communication parameters of Port B and the PLC model LCD Adjust The LCD Contrast Adjust is located at the center of the underside interi...

Страница 18: ...in Program mode and software selectable if in Run and Bypass mode Refer to the Greyline Universal Software Manual for a more complete explanation for baud rates that are software selectable Run and By...

Страница 19: ...Multiple Function Keys Switch 5 on the Dip Switch When this switch is activated the Greyline is capable of recognizing multiple function keys Display Placeholder Switch 6 on the Dip Switch When this...

Страница 20: ...nual Chapter 4 Switch Settings 15 Program Run Bypass Switch The illustration below shows the position of the toggle switch for all three modes PROGRAM RUN BYPASS Artisan Technology Group Quality Instr...

Страница 21: ...s use a Phillips type screwdriver and turn the Contrast Adjust until the desired contrast is achieved The graphic below illustrates the location of the adjustment screw 2024ES4 4 5 7 8 1 S TA TU S CO...

Страница 22: ...as possible Logic Ground Important The communication driver circuits of some Total Control devices may be damaged if communication cables are not properly grounded This will require that the device be...

Страница 23: ...line 2000 Series Operator Workstation Hardware Manual Important Connect logic ground between units and connect shield to chassis ground earth ground Artisan Technology Group Quality Instrumentation Gu...

Страница 24: ...upply connections for standard 115 VAC 230 VAC 230 VAC is an option The following illustration indicates the power supply connections for 230 VAC 10 30 VDC 10 30 VDC is an option The following illustr...

Страница 25: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 26: ...SERIES TWO Devices on a Port SERIES TWO devices may be connected to Port B or Port X PLCs on a Port PLCs may be connected to either Port B or Port X depending on the PLC model Different PLCs may be c...

Страница 27: ...ay be commonly referred to as a PLC Port however it is possible to connect more than just PLCs to Port B This port is configured as a DTE Data Terminal Equipment port Pinout Port B The pinout for Port...

Страница 28: ...ort X Port X is a serial expansion port and may be connected to a SERIES TWO device a serial printer a host computer or a PLC This port is configured as a DCE Data Communication Equipment port Pinout...

Страница 29: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 30: ...he sections which discuss connections and specifications Self Test Self Test automatically occurs when the unit is powered on Upon completion of self test the display prompts TOTAL CONTROL PRODUCTS SE...

Страница 31: ...a defect may exist Contact Total Control Products Inc Customer Service department Testing Keys In Test mode test the keys of the Greyline Operator Workstation by pressing the individual function keys...

Страница 32: ...panel side view and panel cut out dimensions for the Greyline Operator Workstation 6 785 750 2 500 6 850 7 700 F1 F2 F3 F4 F6 F5 F7 F8 FrontVi ew 7 LD 6 LD 7 LD 8 LD 5 LD 2 LD 3 LD 4 1 C LR 4 LD 1 8...

Страница 33: ...Hi Lo Thread Forming Fasteners with Blunt Point must be used Ten of these fasteners have been shipped with the Greyline Operator Workstation Only 8 fasteners are required 2 spares are included Under...

Страница 34: ...ine Adjustable Contrast Number of Lines 2 2024 4 2025 Characters 5 mm 5 x 7 dot matrix Program Message Storage Flash EPROM 128K optional Greyline Port Port A Internal fixed parameters PLC Port Port B...

Страница 35: ...able Contrast Number of Lines 2 2124 4 2125 Characters 5 mm 5 x 7 dot matrix Program Message Storage Flash EPROM 128K optional Greyline Port Port A Internal fixed parameters PLC Port Port B Communicat...

Страница 36: ...Adjust 16 LEDs 8 Local Self Test 25 Logic Ground 17 M Multiple Function Keys 14 N Numeric Function Keys 7 Numeric Keypad 7 P Pinout Port B 22 Pinout Port X 23 PLC Cables 23 PLCs on a Port 21 Port B 11...

Страница 37: ...service in house repair center WE BUY USED EQUIPMENT Sell your excess underutilized and idle used equipment We also offer credit for buy backs and trade ins www artisantg com WeBuyEquipment REMOTE IN...

Отзывы: