730CDT
3-23
Subtest 03
Point to point (Receive)
This subtest, used with Subtest 02 described above, receives the data from the
send side, then sends the received data.
Subtest 04
Interrupt Test
This subtest checks the Interrupt Request Level of IRQ 4, 3 and 5 from the
send side.
Subtest 05
SIR Wrap around test
NOTE: Before conducting Subtests 05 to 07, you must execute
SIRDRV.COM to enable the infrared communication port.
This subtest checks the data send/receive function through the SIR port.
Subtest 06
SIR point to point (Send)
NOTE: To execute Subtests 06 and 07, each computer must have
access to the other computer's infrared port.
This subtest sends 20h through 7Eh data to the receive side, then receives the
sent data and compares it to the original data through the SIR port.
Subtest 07
SIR point to point (Receive)
This subtest, used with Subtest 06 described above, receives the data from the
send side, then sends the received data through the SIR port.
Содержание Tecra 730CDT
Страница 1: ...TOSHIBA 730CDT PN 730 9400 CATM 3970294 B01 ...
Страница 6: ...vi 730CDT ...
Страница 10: ...1 4 730CDT Figure 1 1 730CDT personal computer Figure 1 2 730CDT system unit configuration ...
Страница 190: ...4 60 730CDT ...
Страница 195: ...730CDT B 1 Appendix B Board Layouts B 1 System Board Front View Figure B 1 System board layout front ...
Страница 196: ...B 2 730CDT B 2 System Board Back View Figure B 2 System board layout back ...
Страница 216: ...C 16 730CDT ...
Страница 224: ...E 2 730CDT E 3 German GR Keyboard Figure E 3 GR keyboard E 4 French FR Keyboard Figure E 4 FR keyboard ...
Страница 225: ...730CDT E 3 E 5 Spanish SP Keyboard Figure E 5 SP keyboard E 6 Italian IT Keyboard Figure E 6 IT keyboard ...
Страница 226: ...E 4 730CDT E 7 Scandinavian SC Keyboard Figure E 7 SC keyboard E 8 Swiss German SL Keyboard Figure E 8 SL keyboard ...
Страница 230: ...G 2 730CDT ...