G9000 Installation and Operation Manual
35
The parts (included RemotEyeII) for UPS monitoring are listed below.
TABLE 2-1
Parts list for UPS monitoring
Parts No.
Part name
Qt’y
1
PSAU-60* :Power supply PCB (PS1)
1
2
3BBA0083P001 :Cable1
1
3
RemotEyeII module
1
4
D-sub 9-pin to RJ45 Cable:Cable2
1
5
12V Power Cable:Cable3
1
*
– PCB revision suffix may be applied.
Connected with
3BBA0083P001(Cable1)
Shown in FIGURE 2.17.
D-sub connector CN1
to be connected with
RemotEyeII.
Terminal block TN
to feed 12VDC power
to RemotEyeII.
(12V across P to N)
Optional interface CN2
to give 12VDC power
(12V Pin#1 to #2)
(
Note 12VDC exposed
)
FIGURE 2.15
PSAU-60 PCB (PS1)
FIGURE 2.17
3BBA0083P001 (Cable1)
Connector CN44
to be connected with
CN27 of DPAU-81(SW1).
FIGURE 2.16
DPAU-81 (SW1)
Connector CN27
to be connected with
CN44 of PSAU-60(PS1).
D3200 5pin
(housing)
Содержание T90S3S08KS6XSN
Страница 21: ......
Страница 23: ......
Страница 25: ......
Страница 27: ......
Страница 29: ...G9000 Installation and Operation Manual ...
Страница 31: ...G9000 Installation and Operation Manual ...
Страница 98: ...G9000 Installation and Operation Manual 61 APPENDIX A Installation Planning Guides IPG ...
Страница 99: ...62 G9000 Installation and Operation Manual ...
Страница 100: ...G9000 Installation and Operation Manual 63 ...
Страница 101: ...64 G9000 Installation and Operation Manual ...
Страница 102: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......