3 Tests and Diagnostics
3.6 Main Battery Charge Test
NOTE: The AC adaptor should be connected to successfully run this test
. 65W with 19V DC for UMA 25W CPU model
. 75W with 19V DC for 25W CPU discrete graphics (ParkXT, M92XTX, MadisonLP) and
UMA 35W CPU model
. 90W with 19V DC for 35W CPU discrete graphics (ParkXT, M92XTX, MadisonLP)
This test shows and measures the main battery:
Battery type (Lion)
Manufacturer (Sanyo/Panasonic/Sony)
Remain charge capacity (0 ~ 100%)
Charge function (PASS/FAIL)
- “Battery Is Full” showed when “remain charge capacities” is 100%
The screen should display as below, if the charge function is OK, will show:
Satellite L670D/L675D/ProL67D Series Maintenance Manual
[CONFIDENTIAL]
13
Содержание Satellite L675D Pro
Страница 1: ...Toshiba Personal Computer Satellite Satellite Pro Maintenance Manual TOSHIBA CORPORATION CONFIDENTIAL ...
Страница 17: ......
Страница 35: ......
Страница 200: ...B 4 CONFIDENTIAL SatelliteL670D L675D Pro L670D Maintenance Manual PJP2 Battery conn ...
Страница 240: ...Figure LA keyboard Satellite L670D L675D ProL670D Series Maintenance Manual CONFIDENTIAL 17 ...
Страница 244: ... CONFIDENTIAL SatelliteL670D L675D Pro L670D Maintenance Manual ...