No.
Part name
Compressor
Compressor lead
Procedure
1. Removal of broken compressor
1) Recover the refrigerant gas.
2) Carry out works of 1 of
1
and
2
,
3
.
3) Remove the piping panel (Front).
Remove screws of the piping panel
(Front) and the bottom plate.
(Hexagonal screw Ø4 × 10, 2 pcs.)
Remove screws of the piping panel
(Front) and the piping panel (Rear).
(Hexagonal screw Ø4 × 10, 1 pc.)
4) Remove the piping panel (Rear).
Remove screws of the piping panel
(Rear) and the bottom plate.
(Hexagonal screw Ø4 × 10, 2 pcs.)
5) Remove the valve fixing plate.
Remove bolts of the valve.
(Hexagonal screw Ø6 × 16, 4 pcs.)
Remove screws of the valve fixing plate
and the partition plate.
(ST1T Ø4 × 10, 1 pc.)
Remove screws of the valve fixing plate
and the accumulator.
(Hexagonal screw Ø4 × 10, 1 pc.)
Cut off the bundling band for the dis-
charge pipe and the suction pipe and
then remove each sensor and coil lead
of PMV.
6) Remove the soundproof plate.
(Upper side, outer winding, inner winding)
7) Remove terminal cover from the
compressor and then remove the
compressor lead and also the
compressor case thermo.
8) Remove TD sensor fixed to the
discharge pipe.
9) Remove the compressor lead.
(Leave the ferrite core attached to the
electric parts box as it is.)
Remarks
Compressor
lead
Compressor
case thermo
TD sensor
Bundling
band
Pipe
cover
Piping panel (Rear)
Piping panel (Front)
TS sensor
Pipe cover, bundling
band, each sensor
(TL,TO,TE,TD,TS
sensors) PMV coil
lead.
Accumulator
Suction pipe
Bundling
band, each
sensor
(TL,TO,TE
sensors)
Pipe cover,
bundling band,
each sensor
(TL,TO,TE,TD,
sensors)
7
- 70 -
FILE NO. SVM-17005