No.
Part name
Procedures
Remarks
9
Electronic expansion
valve coil
!
Fan Guard
1. Detachment
1) Perform work of item 1 of
2
.
2) Remove the front cabinet, and put it down
so that fan guard side directs downward.
Perform work on a corrugated cardboard,
cloth, etc. to prevent f aw to the product.
3) Remove the hooking claws by pushing
minus screwdriver according to the arrow
mark in the right figure, and remove the fa
guard.
2. Attachment
1) Insert claws of the fan guard in the holes of
the front cabinet.
Push the hooking claws (9 positions) by
hands and fix the claws
All the attaching works have completed.
Check that all the hooking claws are f xed
to the specif ed positions.
Minus screwdriver
Hooking claw
BODY-PMV
COIL-PMV
Rotate 180°C
1.
Detachment
1)
Perform step 1 in
1
, all the steps in
2
and
1 in 5 .
2)
Turn the coil by 180 degrees then remove
by pull it upward.
2.
Attachment
1) Insert the coil at position which
perpendicular with pipe of PMV then turn
the coil by 180 degrees.
Make sure that lead wire of coil
is opposite with pipe of PMV
FILE NO. SVM-19004
- 125 -
Содержание RAS-18J2AVG-EE
Страница 19: ...4 2 Outdoor Unit RAS 05 07 10 13J2AVG EE C L C L 280 400 Unit mm 280 300 FILE NO SVM 19004 19 ...
Страница 22: ...RAS 16J2KVG EE RAS 16J2AVG EE FILE NO SVM 19004 22 ...
Страница 23: ...RAS 18J2KVG EE RAS 18J2AVG EE FILE NO SVM 19004 23 ...
Страница 135: ...144 9 MOO 5 BANGKADI INDUSTRIAL PARK TIVANON ROAD TAMBOL BANGKADI AMPHUR MUANG PATHUMTHANI 12000 THAILAND ...