Start-up
If the control cords run on the top of the kayak/boat, or they run above the pivot
point of the bracket out of the sleeve of the kayak, then proceed as follows:
4
4
4
5
Fig. 51:
Quick clamp and clamping ring
4
Quick clamp
5
Clamping ring
1. Insert the quick clamp (4) in the clamping ring (5) and screws the nut on, but do
not tighten.
9
8
8
7
6
10
Fig. 52:
Control triangle and swing arm
6
Swing arm
9
M5 screw
7
Nut
10
Control triangle clamping unit
8
Washers
2. Tighten the swing arm (6) hand-tight with a M5 screw (9), two washers (8) and a
nut (7) to the clamping unit of the control triangle (10).
page 85 / 128
Содержание Ultralight 1103 AC
Страница 1: ...Ultralight 403 A AC 1103 AC Translation of the original operating instructions Deutsch English...
Страница 63: ......
Страница 65: ...4 x 8 5 mm 120 7 mm 95 3 mm...
Страница 66: ...4 x 0 33 in 4 75 in 3 75 in...