g345626
Figure 21
1.
Breakage occurs here.
1.
Drive to the location where you will use the
attachment
2.
Inspect the area where you will use the machine
and remove all objects that the machine could
strike.
3.
Locate and mark all electrical or communication
lines, irrigation components, and other
obstructions in the area.
4.
Park the machine on a level surface and lower
the attachment.
5.
Engage the parking brake, shut off the engine,
and remove the key from the traction unit.
6.
Adjust the lift conveyor and secure the arm in
the desired position (
Note:
Ensure there is enough clearance around
the machine where you unfold the conveyor.
g346288
Figure 22
1.
Conveyor arm
3.
Middle position
2.
Extended position
4.
Transport position
7.
Adjust the working depth of the attachment; refer
to
Adjusting the Working Depth (page 13)
.
8.
Mount the upper link arm in the slotted hole so
that the attachment follows the terrain; refer to
Connecting the Upper Link Arm (page 9)
.
9.
Start the traction unit and raise the attachment
so that the knives do not touch the ground.
WARNING
The conveyor belts are rotating when
removing debris and could cause serious
injury.
•
Keep away from moving parts.
•
Keep clear of the discharge opening.
•
Ensure there is clearance for the
second machine collecting the debris.
10.
Allow a second machine for collecting the debris
to drive under the conveyor.
11.
Engage the traction unit into the proper gear.
12.
Activate the hydraulic valve on the traction unit
to engage the horizontal belt and the transport
belt.
13.
Lower the attachment until it is approximately 50
mm (2 inches) above the ground.
16