14
SET–UP INSTRUCTIONS
CHECK TORQUE OF FRONT WHEEL
NUTS
WARNING
Tighten front wheel nuts to 45-55 ft–lb
(61-75 N
m) after 1-4 hours of operation
and again after 10 hours of operation and
every 250 hours thereafter. Failure to main-
tain proper torque could result in failure or
loss of wheel and may result in personal
injury.
GREASE TRACTION UNIT
Before the machine is operated, it must be greased to
assure proper operating characteristics; refer to
Lubrication
Maintenance. Failure to grease the machine
will result in premature failure of critical parts.
Note: After set–up has been completed, remove
protective edging (used for shipping) from fenders.
INSTALL REAR WEIGHT
To comply with ANSI/OPEI B71.4–1999 Standard, rear weight must be added to rear of traction unit. Use chart below
to determine weight requirements. Order parts from your local Authorized Toro Distributor.
24–5780
Rear Weight
Required
Weight Part
Number
Weight
Description
Qty.
Cutting Unit
Description
72” Side Discharge
(Model 30722)
or
72” Rear Discharge
(Model 30710)
or
Guardian 72” Recycler
(Model 30716)
24–5780
105 lb.
Rear Weight Kit
(includes two 35 lb.
weights and mounting
hardware)
&
1
24–5790
Rear Weight Kit
(includes one 35 lb.
weight)
Capscrew –1/2–13 x 12”
Lockwasher–1/2”
Spacer
Nut–1/2”
1
&
72” Flex
(Model 30799)
210 lb.
Rear Weight Kit
(includes two 35 lb.
weights and mounting
hardware)
3
2
2
2
2
325–8
3253–7
3–8847
3217–9
BEFORE OPERATING
CHECK CRANKCASE OIL
The engine is shipped with 3.5 quarts (3.25 L) of oil in the
crankcase. However, level of oil must be checked
before and after the engine is first started.
1.
Position the machine on a level surface.
2.
Disengage hood latch and open the hood.
3.
Slide bottom of hood prop out of retaining bracket
(Fig. 12). Lower hood prop, pivot upward, then
downward to prop up hood.
Figure 12
1. Hood Prop
1
Содержание 30789
Страница 2: ......
Страница 37: ...36 HYDRAULIC SCHEMATIC...