![Toro 30411 Скачать руководство пользователя страница 223](http://html1.mh-extra.com/html/toro/30411/30411_service-manual_1133189223.webp)
Groundsmaster 4100−D
Page 7 − 5
Chassis
CAUTION
When raising machine, use correct blocks,
hoists, and jacks. Make sure machine is parked
on a solid, level surface such as a concrete
floor. Prior to raising machine, remove any at-
tachments that may interfere with the safe and
proper raising of the machine. Always chock or
block wheels. Use jack stands or solid wood
blocks to support the raised machine. If the ma-
chine is not properly supported by blocks or
jack stands, the machine may move or fall,
which may result in personal injury.
3. Chock rear wheels and jack up front of machine.
Support machine on jack stands. Remove front wheel
next to lift arm that is being removed.
4. Remove flange head screw and lock nut that secure
lift cylinder pin to lift arm. Remove pin and separate lift
cylinder from lift arm.
5. Remove lock nut that secures lift arm pin. Support lift
arm and slide pin from frame and lift arm. Remove lift
arm from frame.
6. As needed, disassemble lift arm:
A. Remove height−of−cut chain and damper as-
sembly.
B. Press flange bearings from lift arm.
C. Remove flange nut, flat washer, and support hub
from tapered stud. Remove tapered stud with spheri-
cal bearing from lift arm after removing retaining ring
from lift arm. Remove flange nut and spherical bear-
ing from stud.
Installation
1. If removed, install components to lift arm.
A. Assemble height−of−cut chain u−bolt so that
threaded portion of u−bolt extends .750” (19.1 mm)
above mounting plate on lift arm (Fig. 3).
B. If rod ends were removed from damper, apply
Loctite #242 to threads and install on damper. Install
damper assembly to lift arm with damper rod end to-
ward deck (Fig. 4).
C. Press flange bearings into lift arm.
D. Install spherical bearing on tapered stud and se-
cure with flange nut. Torque flange nut from 100 to
140 in−lb (11.3 to 15.8 N−m). Install stud with spheri-
cal bearing into lift arm and secure with retaining ring.
E. Thoroughly clean tapered surfaces of stud and
mounting boss of support hub. Secure support hub
(position slotted hole in hub toward rear of deck) to
tapered stud with flat washer and flange nut. Tighten
flange nut from 155 to 185 ft−lb (210 to 321 N−m).
2. Position lift arm to frame and insert lift arm pin. En-
gage roll pin into frame slots and install lock nut on pin.
Torque lock nut from 60 to 70 ft−lb (81 to 94 N−m).
3. Align lift cylinder with lift arm. Slide lift cylinder pin
through lift arm and cylinder end. Secure pin with flange
head screw and lock nut.
4. Install front wheel assembly. Lower machine to the
ground.
5. Install cutting deck (see Cutting Deck Installation in
Chapter 8 − Cutting Deck).
6. Lubricate lift arm grease fittings (see Operator’s
Manual).
7. After assembly is completed, raise and lower the cut-
ting deck to verify that hydraulic hoses and fittings do not
contact anything.
8. Check height−of−cut and deck pitch adjustment (see
Operator’s Manual).
1. Lift
arm
2. U−bolt
threads
Figure 3
1
.750”
(19.1 mm)
2
1. Lift
arm
2. Deck castor arm
3. Support
hub
4. Damper
Figure 4
2
1
4
3
Chassis
Содержание 30411
Страница 1: ...Form No 03116SL Rev G Groundsmaster 4100 D Model 30411 Original Instructions EN...
Страница 4: ...NOTES _...
Страница 6: ...Groundsmaster 4100 D This page is intentionally blank...
Страница 8: ...Groundsmaster 4100 D This page is intentionally blank...
Страница 14: ...Groundsmaster 4100 D Page 1 6 Safety This page is intentionally blank...
Страница 16: ...Groundsmaster 4100 D Page 2 2 Product Records and Maintenance Equivalents and Conversions...
Страница 22: ...Groundsmaster 4100 D Page 2 8 Product Records and Maintenance This page is intentionally blank...
Страница 27: ...Groundsmaster 4100 D Page 3 5 Kubota Diesel Engine Rev A This page is intentionally blank Kubota Diesel Engine...
Страница 42: ...Groundsmaster 4100 D Page 3 20 Kubota Diesel Engine Rev A This page is intentionally blank...
Страница 48: ...Groundsmaster 4100 D Hydraulic System Page 4 6 This page is intentionally blank...
Страница 99: ...Groundsmaster 4100 D Hydraulic System Page 4 57 This page is intentionally blank Hydraulic System...
Страница 115: ...Groundsmaster 4100 D Hydraulic System Page 4 73 This page is intentionally blank Hydraulic System...
Страница 126: ...Groundsmaster 4100 D Hydraulic System Page 4 84 This page is intentionally blank...
Страница 131: ...Groundsmaster 4100 D Hydraulic System Page 4 89 This page is intentionally blank Hydraulic System...
Страница 190: ...Groundsmaster 4100 D Page 5 36 Electrical System This page is intentionally blank...
Страница 197: ...Groundsmaster 4100 D Page 6 7 Axles Planetaries and Brakes This page is intentionally blank Axles Planetaries and Brakes...
Страница 226: ...Groundsmaster 4100 D Page 7 8 Chassis This page is intentionally blank...
Страница 231: ...Groundsmaster 4100 D Cutting Deck Page 8 5 This page is intentionally blank Cutting Deck...
Страница 235: ...Groundsmaster 4100 D Cutting Deck Page 8 9 This page is intentionally blank Cutting Deck...
Страница 246: ...Groundsmaster 4100 D Cutting Deck Page 8 20 This page is intentionally blank...
Страница 248: ...Groundsmaster 4100 D Electrical Diagrams Page 9 2 This page is intentionally blank...
Страница 250: ...Page 9 4 Glow Plug Circuit Power Current Control Current Indication Current Logic Direction Groundsmaster 4100 D...
Страница 251: ...Page 9 5 Crank Circuit Power Current Control Current Indication Current Logic Direction Groundsmaster 4100 D...
Страница 252: ...Page 9 6 Run Transport Circuit Power Current Control Current Indication Current Logic Direction Groundsmaster 4100 D...
Страница 255: ...Page 9 9 Groundsmaster 4100 D Main Wire Harness...
Страница 257: ...Page 9 11 Groundsmaster 4100 D Engine Wire Harness D4 D2 D6...
Страница 259: ...Page 9 13 Groundsmaster 4100 D Front Wire Harness D7 D8 D5...
Страница 261: ...Page 9 15 Groundsmaster 4100 D Cutting Deck Wire Harnesses...
Страница 262: ......