![Toro 04510 Greensmaster 3300 TriFlex Скачать руководство пользователя страница 86](http://html.mh-extra.com/html/toro/04510-greensmaster-3300-triflex/04510-greensmaster-3300-triflex_service-manual_1132852086.webp)
Greensmaster 3300/3400
Hydraulic System
Page 5 -- 34
Charge Relief Valve Pressure Test (Using Tester with Flowmeter and Pressure Gauge)
ENGINE
GEAR
C
3000
PSI
10.3
RIGHT
AB
AB
.33
.58
1.44
110 -- 150
PSI
G1
G2
A
B
B
A
TOP
PORT
BOTTOM
PORT
BAC
K
POR
T
C1
HYDROSTAT
BYPASS
VALVE
1.9 GPM
70 to
MOW = 6.7 GPM AT 3.8 MPH
TRANSPORT = 17.5 GPM AT 10 MPH
PSI
OPTIONAL 3WD
FRONT POR
T
10.3
20.6
3000
PSI
PUMP
100
MO
TO
R
LEFT
MO
TO
R
HYDRAULIC
RESERVOIR
FROM
POWER STEERING AND
LIFT CONTROL VALVES
FROM
STEERING VALVE
TO POWER
CONTROL VALVE
TO MOW
PRESSURE
GAUGE
The traction charge circuit is designed to replace loss of
hydraulic fluid from the closed loop traction circuit. The
charge relief valve pressure test will identify if charge
pressure is correct.
Procedure for Charge Relief Valve Pressure Test:
1. Make sure hydraulic oil is at normal operating tem-
perature by operating the machine for approximately ten
(10) minutes.
2. Park machine on a level surface with the cutting units
lowered. Make sure engine is off and the parking brake
is engaged. Make sure the hydraulic tank is full.
CAUTION
Prevent personal injury and/or damage to equip-
ment. Read all WARNINGS, CAUTIONS and Pre-
cautions for Hydraulic Testing at the beginning
of this section.
3. Thoroughly clean junction of hydraulic hose and hy-
draulic tube that runs under piston (traction) pump (Figs.
20 or 21). Disconnect hydraulic hose from the hydraulic
tube.
4. Install a tee fitting between the disconnected hose
and tube. Install a 1000 PSI (70 bar) pressure gauge to
the tee fitting.
5. Make sure that traction pedal, steering wheel and
joystick are in the neutral position.
6. Start engine and run at low idle speed. Check for hy-
draulic leakage at pressure gauge and correct before
proceeding with test.
7. Move throttle so engine is running at high idle speed.
8. Pressure gauge should read approximately
110 to
150 PSI (7.6 to 10.3 bar)
.
9. Shut off engine. Record test results.
Содержание 04510 Greensmaster 3300 TriFlex
Страница 2: ...Greensmaster 3300 3400 This page is intentionally blank ...
Страница 4: ...Greensmaster 3300 3400 This page is intentionally blank ...
Страница 6: ...Greensmaster 3300 3400 This page is intentionally blank ...
Страница 14: ...0 09375 Greensmaster 3300 3400 Page 2 2 Product Records and Maintenance Equivalents and Conversions ...
Страница 24: ...Greensmaster 3300 Page 3 6 Gasoline Engine This page is intentionally blank ...
Страница 38: ...Greensmaster 3400 Page 4 4 Diesel Engine This page is intentionally blank ...
Страница 54: ...Greensmaster 3300 3400 Hydraulic System Page 5 2 This page is intentionally blank ...
Страница 63: ...Greensmaster 3300 3400 Hydraulic System Page 5 11 This page is intentionally blank Hydraulic System ...
Страница 83: ...Greensmaster 3300 3400 Hydraulic System Page 5 31 This page is intentionally blank Hydraulic System ...
Страница 121: ...Greensmaster 3300 3400 Hydraulic System Page 5 69 This page is intentionally blank Hydraulic System ...
Страница 125: ...Greensmaster 3300 3400 Hydraulic System Page 5 73 This page is intentionally blank Hydraulic System ...
Страница 131: ...Greensmaster 3300 3400 Hydraulic System Page 5 79 This page is intentionally blank Hydraulic System ...
Страница 137: ...Greensmaster 3300 3400 Hydraulic System Page 5 85 This page is intentionally blank Hydraulic System ...
Страница 155: ...Greensmaster 3300 3400 Hydraulic System Page 5 103 This page is intentionally blank Hydraulic System ...
Страница 167: ...Greensmaster 3300 3400 Hydraulic System Page 5 115 This page is intentionally blank Hydraulic System ...
Страница 170: ...Greensmaster 3300 3400 Hydraulic System Page 5 118 This page is intentionally blank ...
Страница 172: ...Greensmaster 3300 3400 Page 6 2 Electrical System This page is intentionally blank ...
Страница 181: ...Greensmaster 3300 3400 Page 6 11 Electrical System This page is intentionally blank Electrical System ...
Страница 223: ...Greensmaster 3300 3400 Page 6 53 Electrical System This page is intentionally blank Electrical System ...
Страница 230: ...Greensmaster 3300 3400 Page 6 60 Electrical System This page is intentionally blank ...
Страница 265: ...Greensmaster 3300 3400 DPA Cutting Units Page 8 9 This page is intentionally blank DPA Cutting Units ...
Страница 279: ...Greensmaster 3300 3400 DPA Cutting Units Page 8 23 This page is intentionally blank DPA Cutting Units ...
Страница 303: ...Greensmaster 3300 3400 Groomer Page 9 13 This page is intentionally blank Groomer ...
Страница 318: ...Greensmaster 3300 3400 Page 10 2 Foldout Drawings This page is intentionally blank ...
Страница 332: ...Page 10 16 This page is intentionally blank ...