1. Cut off the wire which has been connected between terminal 4 and 5 in factory to deactivate the existed 
short circuit of terminal 4 and 5. 
2. Solder the two wires to the terminals of the switch respectively. 

NOTE: The power supply cord is not included in the package. 
NOTE: Make sure a residual current circuit breaker with a 30mA threshold is fitted before the power 
supply mains.   
NOTE: The protection class of the emergency stop switch should be at least IP44. 
 

Connecting of the Batteries & Solar Panels & Solar Controller 

WARNING: NEVER connect the gate opener to the power outlet before all the installations have 

been done. 
NOTE:   
1. The batteries (ONLY included in Y Series) can be used as back-up power or main power. The wire 
connection is different for the two conditions. 
2. If batteries as are chosen as the power source, Marine or Automotive Type Battery is required. The 
batteries should be waterproof type, or be placed in water proof circumstance. 
3. 2 PCS 12VDC batteries can be connected in series to function as 24VDC. The following diagram 
shows on how to connect 2 PCS batteries in series. Charging mode for the battery could be only by 
the solar panel OR both of the solar panel and the AC electricity at the same time. 
4. Please note that the wire connection of the power supply system is very important. Incorrect wire 
connection will damage the control board.   
 

1. Using with the AC electricity at the same time 

The gate opener can be powered by the AC electricity and the batteries at the same time. The batteries are 
used as back-up power source in case of AC power failure. In this situation, 5AH batteries are enough if the 
power failure time is less than 8 hours per day. Please connect the batteries & the solar panels & solar 
controller refer to the following illustration. 

 

Содержание DK1000

Страница 1: ...0a DK1000 S Y T Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the battery Periodic...

Страница 2: ...allation Overview 6 Installation of the Opener 6 Manual Operation 7 Fit The Rack 8 Installation of the Magnets 9 Connecting of AC Main Power Supply 9 Connecting of the Batteries Solar Panels Solar Con...

Страница 3: ...e factory declines all responsibility for any consequences resulting from failure to observe Good Technical Practice when constructing closing structures door gates etc as well as from any deformation...

Страница 4: ...table for use The gate should be mounted and moved freely Check that the structure is sufficiently strong and rigid and that its dimensions and weights conform to those listed in the specifications ta...

Страница 5: ...4 Parts List Extra Parts Rev 20a...

Страница 6: ...TOPENS Store Technical Specifications Features Specifications Model DK1000 S Y T Power supply 110V 120V 60Hz or 220 240V 50Hz Motor voltage 24VDC Absorbed power 350W Gate moving speed 20 cm s 8 in s M...

Страница 7: ...ble auto close none 30 60 90 seconds Built in max Motor Running Time MRT for multiple safety protection 90 seconds Reliable electromagnetism limit for easy adjustment Can be equipped with a wide range...

Страница 8: ...before pouring concrete Remember that cable conduits have to pass through the hole in the base plate 3 Pour concrete and before it starts to harden check that it is parallel to the gate leaf and perf...

Страница 9: ...of rack section on the gear of opener as a temporary support Make rack level and mark the rack s mounting holes four holes for light duty or six holes for heavy duty on the gate 4 Fit the rack by sel...

Страница 10: ...The magnets should be 20 30mm away from the Limit Switch Box If it is too near or too far the switches will fail to work Adjust the position of the magnets until the positions of the opening and closi...

Страница 11: ...are chosen as the power source Marine or Automotive Type Battery is required The batteries should be waterproof type or be placed in water proof circumstance 3 2 PCS 12VDC batteries can be connected...

Страница 12: ...condition and accessories needs which we can calculate the configuration of the solar panel and the batteries Please connect the batteries the solar panels solar controller refer to the following illu...

Страница 13: ...button should be wired to the 16 and 17 terminals No matter the polarity The gate operator works alternately by pressing the button open stop close stop open 6 Exit Wand optional The BLACK wire of the...

Страница 14: ...pad should be connected into the 17 terminal NOTE Using of the photocell exit wand keypad and external receiver would cause the battery exhausted quickly Big capacity of batteries and big power of sol...

Страница 15: ...te the gate opener to run for a complete opening cycle and a complete closing cycle to get the full opening time and the full closing time You would achieve the soft stop in your next opening closing...

Страница 16: ...ition to increase the reversing sensitivity Note 1 If the sensitivity setting is too higher the gate will stop or reverses very easy by itself while there is little obstruction or resistance such as s...

Страница 17: ...on refer to more details in our TOPENS sliding gate opener manual So it is must program button A with sliding gate opener while you may program either C button or D button with TOPENS swing gate opene...

Страница 18: ...wires of the motor from terminal 1 and 2 Connect the wires to 24V battery directly the motor should run and then exchange the wires the motor should run in the opposite direction If the motor runs in...

Страница 19: ...se note the two limit magnets are different one is N pole and another is S pole Please try to exchange the two magnets 2 Please try to exchange the limit switch wires CL close and OP open 3 Maybe the...

Страница 20: ...e do not hesitate to contact us E mail support topenstool com Kindly include your Product Model Purchasing Date Site Order and your contact information All your concerns will be replied within 24 hour...

Отзывы: