background image

Instruction Manual for the  

Manufactured by 

E-S

C

 1102 Series 

Содержание Estate Swing E-SC 1102 Series

Страница 1: ...Instruction Manual for the Manufactured by E SC 1102 Series...

Страница 2: ...allation must conform to Standards EN 12453 and EN 12445 The safety level of the automated system must be C D 10 Before attempting any job on the system cut out electrical power and disconnect the bat...

Страница 3: ...the battery The SLAVE equipment is controlled by the MASTER equipment to which all accessories and pulse gen erators are connected The MASTER card can be programmed and is used to set the following f...

Страница 4: ...ing 2 Control Board Layout 2 1 IMPORTANT Charging Battery Prior to Use 2 2 3 Basic Installation 3 IMPORTANT Setback Clearance 3 1 Installation of Mounting Hardware and Arm 3 2 3 Mounting Control Box 4...

Страница 5: ...ting 7 Simple Diagnostics 7 1 Trouble Shooting 7 2 5 Logic Summaries and Flow Charts 7 6 7 Accessories 8 Accessory Terminals 8 1 2 Photocell Safety Device Guide 8 3 4 Installing Accessories 8 5 Table...

Страница 6: ...3 CANNOT BE MODIFIED Use frequency cycles hour 5 Consecutive cycles on charged battery Max 15 Battery recharge time 10 min for each full cycle Operating ambient temperature 4 to 131 Deg F Operator wei...

Страница 7: ...ion during entire travel Make sure the hinges are in good condition Ball bearing hinges are ideal for gates weighing over 200 lbs or over 10 in length Make sure the gate is plumb and level The fence p...

Страница 8: ...ount Brackets E Transmitter F Receiver G Post Mounting nuts Manual Release Key H Transformer A Control Box B Operator Arm C Gate Mount Bracket D Post Mount Brackets G Post Mounting nuts Manual Release...

Страница 9: ...erator Length is determined by distance between transformer power supply and the control box 8 5 16 Redheads Lag Screws and shields or other anchoring system will be needed to fasten the column bracke...

Страница 10: ...safety cables push buttons receivers photocells etc To avoid any electrical noise use separate sheaths or a shielded cable with earthed shield Layout of Master Control Board Layout of Slave Control Bo...

Страница 11: ...ery into the control board fig 1 For charg ing purposes it is not necessary to hook the receiver to the battery or control board 2 Insert the wires from the supplied AC transformer into terminal J2 of...

Страница 12: ...f the master must connect with the left side of the slave fig 3 NEVER CONNECT POWER FROM ANY SOURCE DIRECTLY TO THE SLAVE BOARD The slave board may ONLY be connected to the Master control board Let th...

Страница 13: ...l leverage during opening and closing cycles 3 1 The purpose of this page is to clarify and show examples of possible setbacks Install the brackets according to the installation directions following t...

Страница 14: ...amples of industrial door stops 2 Position the column bracket to the dimensions from the previous page In most installations the gate is already hung so the distance between A and B is going to dictat...

Страница 15: ...carry the gate an inch further by just turning the base gears of the operator 5 Manually release the opener arms Do this by removing the black cap o the top inserting the release key and turning it un...

Страница 16: ...and attach the control box to the post 4 There are three separate knockouts on the bottom of the control box Find a water tight connector at your local hardware store that will fit one of the knockout...

Страница 17: ...erminal strip at the bottom of the control board is easily removed for wiring Simply pull straight down on the terminal strip to remove it from the board It will slide right off Slide it back on when...

Страница 18: ...ty terminals together with the fourth which will lead to the com mon terminal The connection can be secured with electrical tape or a wire nut This allows one terminal to be freed for a safety device...

Страница 19: ...6 MUST connect with the RIGHT side of J2 on the Slave board Terminal 15 MUST connect with the LEFT side of J2 on the Slave board J3 Actuator Connections This terminal is used to connect the operator a...

Страница 20: ...e Swing board Setting the Dip Switches 1 Set the dip switches on the receiver by switch ing them in the up down or center position Record this dip switch combination 2 Slide off the battery cover of t...

Страница 21: ...Es tate Swing control board 3 Before plugging in your transformer plug the battery into the control board The clear plastic clip gets clipped into J4 with the clip side on the left The other side of t...

Страница 22: ...ing full open By selecting Logic EP 4 all pause times will be void and the gate will remain open until an opening devices is triggered C Switches between the amount of time the gate waits before begin...

Страница 23: ...s an increased amount of motion stop points 4 EP Stepped Semi automatic is designed to function similar to a garage door opener Turns off the auto close setting B Pause Times 1 5 Seconds 2 10 Seconds...

Страница 24: ...6 times to light A E simultaneously While the 5 LEDs are lit steadily hold down P2 for about 3 seconds The operator will start the maneuver process Using P2 Briefly press the button once for each of...

Страница 25: ...sing open stops 4 alt Press P2 to stop the openers opening motion and reverse the motion of the gate 3 Press P2 to teach leaf 2 opening decelera tion starting point Without open stops press P2 6 4 5 P...

Страница 26: ...of arm Leaf 1 will begin closing 7 Press P2 to teach leaf 1 closing decelera tion starting point 8 Let the leaf 1 make contact with the full closed stop point or full closing point of arm Press P1 to...

Страница 27: ...active for 5 minutes and then the board returns to all LEDs OFF WARNING When you access the input status function all acces sories are powered even with the gate idle P1 is active and can be used to...

Страница 28: ...to the right Reverse the polarity for Push To Open Operation Check the fuse to be sure the fuse is not blown It can be tested visually or with a volt meter by checking for continuity between the two...

Страница 29: ...te stops mid cycle Check the force setting D variable 4 is the highest Try moving the force to high Check the speed setting E variable If the gate is heavy and moves too quickly sometimes the jerk of...

Страница 30: ...ual openers CDE and 1 should be on The rest off If 1 is off then the slave is not communicating with the master check your connection to the slave and the polarity of the connection Section 9 If using...

Страница 31: ...to e mail digital photos to the technician This is done in your best interest to save unnecessary shipping expenses and time lost Many times we can come up with solutions to issues by seeing pictures...

Страница 32: ...before re closing Re closes the leaf No effect Closes after 5 sec onds Closing Re opens the leaf No effect Reverses direction of motion Opening Re closes the leaf Reverses direction of motion No effec...

Страница 33: ...ect Reverses direction of motion Opening Stops operation Reverses direction of motion No effect Stopped in mid cycle Restarts motion in opposite direction the gate was previously moving before stopped...

Страница 34: ...g and or closing pulse for only the gate leaf controlled by the master control board 3 Stop Command This is a normally closed terminal where by any device i e push button which by opening a contact ha...

Страница 35: ...connecting the master and slave board This will cause permanent damage to both boards and will void the war ranty Caution 7 8 Positive 7 8 24 Voltage Positive 24V for powering accessories that are run...

Страница 36: ...act and crushing Closing Safety Devices They operate only during the gate closing movement and therefore are suitable for pro tecting the closing zone against the risk of impact Opening Closing Safety...

Страница 37: ...8 4...

Страница 38: ...ener to be active this cir cuit must be closed When a device opens this circuit it stops the motion of the gate operator This circuit is the main circuit for safety devices i e photo eyes safety loops...

Отзывы: