![Toledo ZT-1 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/toledo/zt-1/zt-1_user-manual_1125209011.webp)
ZT-1 User’s Manual – Installation
DOC #18172 Page 11
DC Power Connection
24VDC power is connected to the ZT-1 as shown in Figure 2.
Figure 2:
DC Power Wiring
Notes:
1) The 24VDC source can be in range from 18VDC to 32VDC.
2) It is important to connect an Earth Ground to the GND terminal.
3) Do not apply power until all the wirings in this Installation Section are done.
Содержание ZT-1
Страница 1: ...ZT 1 Load Module User s Manual For Pre calibrated Load Cells or other Load Cell use Revision A...
Страница 2: ...ZT 1 User s Manual Installation DOC 18172 Page 2...
Страница 3: ...ZT 1 User s Manual Installation DOC 18172 Page 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 7: ...ZT 1 User s Manual Installation DOC 18172 Page 7 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 9: ...ZT 1 User s Manual Installation DOC 18172 Page 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...ZT 1 User s Manual Installation DOC 18172 Page 14 Figure 4 Strain Gage Sensor Input...
Страница 18: ...ZT 1 User s Manual Installation DOC 18172 Page 18 Figure 7 20mA out Sensor Input...
Страница 33: ...ZT 1 User s Manual Operation DOC 18172 Page 33 3 Set the OFF PRB switch to PRB...
Страница 34: ...ZT 1 User s Manual Operation DOC 18172 Page 34...
Страница 36: ...ZT 1 User s Manual Appendix DOC 18172 Page 36 THIS PAGE INTENTIONALLY LEFT BLANK...