background image

19

 

Maintenance of the control unit

 

1.

 

Cleaning the outside

 

 

Turn off power to the unit and to the computer. Wipe down the outside of the box with a soft cloth.

 

2. Cleaning the inside

 

 

Turn off the power from the control unit and the computer. Remove the control unit

s electric cable 

from the wall socket and the connecting cable between the computer and control unit before starting. Re-
move the cover of the control unit by lifting it upwards. Use a vacuum cleaner (a mini vacuum designed for 
appliances) to gently remove the dust inside the unit. 

 

3. Lubricating the slide bars

 

The metal slide bars inside the box need to be lubricated 
every 6 months (more often with heavy use). Make sure 
power cord and computer cable are disconnected, then 
cover the electronic card in the box with a piece of card-
stock or light cardboard to protect it. Wipe the metal  
slide bars clean with a dry cloth, then use a cotton swab 
to spread a light amount of sewing machine or spinning 
wheel oil on the bars. Do not put oil on the square bear-
ings on the bars. Be very careful so that the oil doesn

spread elsewhere.

 

 

4. 

Periodically check the wingnuts and wedges to make sure they haven

t wiggled loose, espe-

cially after projects that take heavy beating. Tighten as needed. 

 

Содержание Eeva ES

Страница 1: ...changeable 1 2x6 approx with holes the ends are narrower and have slots lower back cross piece 1 2x5 approx the ends are narrower and have slots lower front cross piece 1 2x4 approx the ends are narro...

Страница 2: ...nto the shaft bar letting it sit in the second indentation This secures the rod onto the shaft bar Now take another shaft bar and slide it onto the other end of the metal rod and secure that with an O...

Страница 3: ...es and place it into the hole at the bottom near the front of the loom This piece should be set in with the wide side parallel to the floor In sert another wedge into the slot at the end of that piece...

Страница 4: ...d be in the upper position and tightened in place it sometimes loosens during shipping so that the gear and teeth are engaged In addition the pawl above the gear should be vertical and tightened so it...

Страница 5: ...knee beams For packing purposes the blocks that hold the back beam are installed inside the castle sides fig 3 Unbolt these blocks and install them on the back of the castle sides fig 4 There are 2 p...

Страница 6: ...it slide in Breast beam Back beam Knee beam Leveling the loom In order for the control mechanism to function properly the loom must sit level on the floor Check this by placing a level on the top edg...

Страница 7: ...wingnut the wingnut should be on the back side Back side Front side Attach the beater cap to the sides with bolts and wingnuts fastening near the top of the metal slides with the wingnuts facing the...

Страница 8: ...ng the control box on the rails This is best with 2 people as you will need to balance the box on the rails while attaching it Start by placing the 2 rails on a flat surface and hold them steady while...

Страница 9: ...set of 3 holes furthest back on the side frame Measure the distance between the 2 rails with the box attached and use that measurement to determine which of those 3 holes to use and insert the dowel E...

Страница 10: ...s in the bench legs this will allow you to adjust the seat to your comfort level Hanging the shafts text from video tutorial Installing the pulleys To install the pulleys find the three long rods with...

Страница 11: ...ake the loop around the bar a few inches and secure it at the end with an anchor peg Holding the shaft inside the loom take the other end of the texsolv and loop it OVER the left side pulley of shaft...

Страница 12: ...making a tight loop Fig 3 Grab the texsolv cord coming out of the computer as sist box for the shaft you are hanging and pull the cord through the holes in your texsolv loop Fig 2 3 2 Note the red col...

Страница 13: ...ng is to make sure that the threads come through the reed at the correct point You will do this step once you have your first warp on the loom Once the loom is threaded and the reed is sleyed look at...

Страница 14: ...pen A first tap will open the next shed and hold it open The next tap will close that shed and open the next shed Your foot only taps but does not hold the pedal Slow is operated with the only the rig...

Страница 15: ...ready to weave click on Loom Control under the Weave menu The Loom Test The loom test is a diagnostic test that lets us know if the loom control box is working correctly Use it to check the loom when...

Страница 16: ...in your draft the starting pick will be 1 and the end pick will be the last pick in your draft However sometimes you will have a treadling section that repeats and you can use these buttons to set the...

Страница 17: ...g the Comports EW system looms older than 2016 1 Shut down computer and loom 2 Connect the serial cable to the computer and the loom box 3 Turn on the loom and the computer 4 See if the computer downl...

Страница 18: ...to the control box The warp is too tight Cords often slip from the rollers The peg is too close to the roller The shaft only rises from the other end The cord from the neighboring shaft has jumped ove...

Страница 19: ...ust inside the unit 3 Lubricating the slide bars The metal slide bars inside the box need to be lubricated every 6 months more often with heavy use Make sure power cord and computer cable are disconne...

Страница 20: ...e loom box to us for repairs If it is necessary to send the loom box back to Webs we will supply packing in structions Costs of packing are not covered by the warranty After the first 60 days the purc...

Отзывы: