background image

                                                                           

Page 

1

 of 

17

 

Main Specifications :

 

-   Assembly size : W5.5 x L13.5 x H5.3 (m) / 18 x 45 x 17 (ft)

 

-   Shoulder height : 4 m / 13 ft

 

-

 

Front roll up door : 4.09 x 4.26 (m) / 13 x 14 (ft)

 

Prior to assembly 

 

Please read the instructions carefully before installation. It is important to follow your 
local safety regulations and industry standards during installation. Regulations may 
include but are not limited to : 

 

 

- Safety helmets, protective eyewear, and clothing 

 

- Safety harnesses for all elevated workers 

 

- Proper ladder, cage, and safety operation 

 

 

Check all components and parts before installation. All parts are marked with a part 
number, please refer to the parts list to make sure you have all parts. 

 

 

Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not 
make any alterations to the structure. Do not hang any weights on the frame during 
installation, including parts. We are not responsible for any damages or injuries caused by 
inappropriate installation, unauthorized modifications or extreme weather. 

 

 

This building is not intended for human occupancy. 

 

 

It is recommended to tape or add foam/rubber on the frame where joints connect and 
where it touches the cover. This will help extend the life span of the cover. 

 

 

Read the following item list carefully and count the number of items to ensure that all 
parts are included prior to setup. 

 

Installation steps 

 

Step 1 : Review the whole structure and choose the proper installation site

 

 

 

Choose a solid flat level ground area to set up the building. Do not install the building on 
soft ground, wetland, uneven surfaces, sloped surfaces, or on top of structures that are not 
rated to hold its weight. 

 

 

We strongly recommend that you build the structure on a solid foundation such as cement 
and use anchor bolts on all baseplates. 

 

 

Be aware of the surrounding area. Do not set up the building near snowdrifts, open 
flames or exposed electrical wires. Do not keep heat sources near the fabric cover. 
Keep the building surroundings clear at all times.

 

Содержание TMG-184517ST

Страница 1: ...Page 0 of 17 Main Specifications...

Страница 2: ...r any damages or injuries caused by inappropriate installation unauthorized modifications or extreme weather This building is not intended for human occupancy It is recommended to tape or add foam rub...

Страница 3: ...ront truss 2 1 1 2B Upper rafter tube rear truss 2 1 1 3 Shoulder tube middle truss and rear truss 18 1 1 3A Shoulder tube front truss 2 1 1 4 Sidewall tube middle truss 16 1 1 4A Sidewall tube front...

Страница 4: ...r truss 4 1 1 9 Door frame upper tube front truss 2 1 1 9A Rear frame middle tube 2 1 1 10 Door frame middle horizontal tube front truss 2 1 1 10A Door frame middle horizontal tube rear truss 2 1 1 10...

Страница 5: ...ttom tension bar Front cover 2 1 1 12A Bottom tension bar Rear cover 2 1 1 12B Bottom middle tension bar Rear cover 1 1 1 13 Diagonal bracing bar 1st and last span 4 1 1 13A Tube clamp 58mm 4 1 1 13B...

Страница 6: ...70mm 168 1 1 18A Half round head bolt M8 x 80mm 12 1 1 19 Hex bolt M10 x 30mm 12 1 1 19A Hex bolt M10 x 50mm 8 1 1 20 Nylon rope 2 1 1 21 Water plug 16 1 1 22 Top cover 1 1 1 23 Front cover panel 1 1...

Страница 7: ...this step 4 Baseplates 5L 5R 16 Baseplates 7 2 Baseplates 6 68 Expansion bolts M12 16 2 Baseplates 6A Picture 1 Step 2 Assemble all trusses The building includes 10 trusses 1 front truss 1 rear truss...

Страница 8: ...7 of 17 Picture 2 Parts used to install the rear truss in this step refer to Picture 3 1 Peak arch tube 1 2 Upper rafter tube 2B 2 Shoulder tube 3 2 Sidewall tube 4A 12 Half round head bolt 18 Pictur...

Страница 9: ...fer to Picture 4 1x8 Peak arch tube 1 2x8 Upper rafter tube 2 2x8 Shoulder tube 3 2x8 Sidewall tube 4 12x8 Half round head bolt 18 Picture 4 Lay down all 10 trusses on the ground as Picture 5 when the...

Страница 10: ...from different directions When the truss is up tie the ropes to the heavy objects to make sure the truss will stay upright and use bolt 18 to connect the truss to the baseplate on both sides Picture...

Страница 11: ...bars 13 Connect diagonal bracing bar 13 on the first and last span between the shoulder tube and sidewall tube 3A and 4 with tube clamp 13A use bolt 19A Picture 8 Parts used in this step 2x2 Diagonal...

Страница 12: ...6 Hex bolt 19 1 Door center vertical supporting rod for cross beam 11 1 Ceiling cross bar 11C 1 Ceiling cross bar 11D Picture 9 Step 7 Install the remaining parts on the rear truss Picture 10 Parts us...

Страница 13: ...the tube Insert the dropping tube 15 into the bottom groove pocket on the door cover Tie two ropes 20 separately on both sides of the peak arch tube Pull both ropes under through the bottom of the doo...

Страница 14: ...ure 12 Step 9 Install rear cover panel The door cover must be zipped Use rope 24 to lift up the rear cover 23A from the center grommet and tie it firmly to the truss tube and spread toward both sides...

Страница 15: ...ndy weather Unpack the top cover and place it along one of the long sides of the structure Use 3 to 5 ropes 24 to pull the cover over the top of the structure 2 or 3 people standing inside on ladders...

Страница 16: ...retch the cover enough only to take wrinkles out Repeat for the rear truss Do not over stretch as it could rip off the grommets Picture 15 Picture 15 view from outside Step 12 Tension the cover on the...

Страница 17: ...d right back and forth to make sure it is square and centered Cut the groove pocket where it aligns with ratchet 7A and use strap 25 to pull tension tube 14 toward the ratchet and tie it firmly there...

Страница 18: ...d as soon as possible If snow becomes solid ice on the cover it will increase the weight on the roof and may collapse the shelter or reduce the life span Keep the shelter on a dry ground most of the t...

Отзывы:

Похожие инструкции для TMG-184517ST