Page
14
of
17
Picture 13
Step 10 : Install the top cover (#22)
Do not install the cover during windy weather!
Unpack the top cover and place it along one of the long sides of the
structure.
Use 3 to 5 ropes (#24) to pull the cover over the top of the structure, 2 or 3
people standing inside on ladders to push upwards will help to move the
cover smooth without any damage (Picture 14).
Picture 14
Содержание TMG-184517ST
Страница 1: ...Page 0 of 17 Main Specifications...