172-65116M-02 (CP-N) 16 Jun 2011
14
2. Allow condensate to flow into the condensate recovery pump, and operate the pump
automatically to blow off the newly-built piping downstream of the pump.
(1) Allow condensate to flow into the
pump in order to prepare it for
operation.
Symbol Operation
V
5
Close
V
6
Open
V
7
Open
V
8
Open
V
10
Close
ドレン
V
6
V
7
V
10
V
5
TS
M B
1
M
1
M B
2
冷却水
V
8
P
2
P
1
(2) Switch on the pump control panel. The power lamp will light up.
(3) Turn on the breaker switch in the control panel. Put the select switch for pump
operation to the “automatic” position.
(4) If the condensate temperature is low, the motor valve for start-up blow MB
1
opens by the signal from the thermostat TS to reject the condensate. When the
condensate temperature rises, MB
1
closes, allowing the condensate to flow into
the pump.
(5) The valve MB
2
is in the open position by the signal from the filling water detector
M
1
till the pump is filled with water. It closes once the pump is filled.
(6) The pump begins to start a few minutes after the motor valve for air venting MB
2
closes. Check the delivery pressure P
2
at operation and record it along with the
inlet pressure P
1
.
(7) Flush the piping from the pump to the boiler and adjust the delivery pressure P
2
.
(Put the select switch for feed water control to the “Feeding” position.)
ドレン
V
11
V
10
V
9
V
12
P
1
P 2
V
13
V
14
V m
M B m
V
O
V n
V
3
FM
Symbol Operation Symbol Operation
V
3
Adjust V
14
Close
V
9
Adjust V
m
Open
V
10
Open V
n
Open
V
11
Open V
o
Close
V
12
·
V
13
Close
Condensate
Cooling
water
Condensate