background image

7

UC1 UNIVERSAL CONTROL CONNECTED WITH A SINGLE ZONE 24 VAC THERMOSTAT

XN

R

U

N

IVER

SAL C

O

N

T

R

O

LLER

THERMOSTAT

G

G

INTERNAL CONTROL

OF FURNACE

W

C

Y

R

R

Y

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

W

DRY

115V

24V

IMPORTANT:

D/N 9183046-5

115 VAC

24 VAC

LEGEND:

CALL
JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING 

IMPORTANT:

1. Connect W from t-stat to #1 on terminal block of UC1. 
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler. 
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler. 
4. Make sure RED voltage jumper on UC1 is on 24V.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Connect the 2 green ground wires in UCRT to supply ground. 

Important: Installer must supply overload and disconnect protection.

6. If not previously completed, connect Black, White and Red leads from UCRT to like colors in Rooftop Inducer whip 4x4 weather-

proof junction box. Connect the Green/Yellow ground lead in UCRT to the ground screw in the Rooftop Inducer whip 4x4 
weatherproof box. Connect Blue and Yellow leads from UCRT to PSA-1 Fan Prover switch. Prover Leads are not polarity sensitive.

NOTE:

If burner safety control goes out on lockout, the Inducer will continue to run as long as a call for heat is present.

UC1 UNIVERSAL CONTROL CONNECTED WITH A 24 VAC ELECTRONIC IGNITION MODULE

XN

R

UNIV

E

RS

A

L

 CO

NTRO

LLE

R

D/N 9183046-8

115 VAC

24 VAC

LEGEND:

HONEYWELL IGNITION

CONTROL

MV

MV

PV

CALL

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

DRY

115V

24V

PV

MV / PV    (2)

MV    (1)

PV    (3)

BNR GND    (4)

24V GND    (5)

24V    (6)

(7)

(8)

SPARK    (9)

OR

PI

YE

GR

YE

WH

OR

YE

WH

OR

GR

GAS VALVE

JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING 

IMPORTANT:

1. Remove the wire on MV at gas valve and connect it on #1 on UC1 terminal block. 
2. Connect #2 on UC1 terminal block to MV/PV. 
3. Connect #4 on UC1 terminal block to MV on gas valve.
4. Make sure RED voltage jumper on UC1 is on 24V.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Connect the 2 green ground wires in UCRT to supply ground. 

Important: Installer must supply overload and disconnect protection.

6. If not previously completed, connect Black, White and Red leads from UCRT to like colors in Rooftop Inducer whip 4x4 weather-

proof junction box. Connect the Green/Yellow ground lead in UCRT to the ground screw in the Rooftop Inducer whip 4x4 
weatherproof box. Connect Blue and Yellow leads from UCRT to PSA-1 Fan Prover switch. Prover Leads are not polarity sensitive.

UC1 BURNER INTERLOCK WIRING DIAGRAMS

Содержание UCRT

Страница 1: ...ESE INSTRUCTIONS MAY RESULT IN IMPROPER INSTALLATION ADJUST MENT SERVICE OR MAINTENANCE POSSIBLY RESULTING IN FIRE ELECTRI CAL SHOCK CARBON MONOXIDE POISONING EXPLOSION PERSONAL INJURY OR PROPERTY DAM...

Страница 2: ...ight carrier and your distributor immediately and file a concealed damage claim INSTALLATION RESTRICTIONS 1 The Pre Cycle Prover Status Check is deactivated from the factory on the UCRT Natural chimne...

Страница 3: ...ED POWER LED DRY 24 V 115 V APPLIANCE INTERLOCK RELAY INDUCER MOTOR RELAY A B 1 2 3 4 L N J1 J2 XL XN P1 P2 C GND F 1 9 N M MTR J1 J2 CALL JUMPER Used when the call signal is used as the proven return...

Страница 4: ...be cleared NOTE The UC1 board must have its 115 VAC power supply present when any of the 1 8 dip switches are moved back to their original position for the fault code to clear PRE POST PURGE AND PROVE...

Страница 5: ...VOLTAGE SOURCE IS PROVIDED TO TERMINAL 3 120 VAC 10 50 60 Hz MOTOR 1 H P MAX 120 VAC 50 60 Hz USER PROVIDED 24 VAC AT TERMINALS 1 2 1 CALL HOT 2 COMMON CONTROL REQUIRES 5 mA 24 VAC TO TRIGGER MOVE RE...

Страница 6: ...ed in these instructions call Tjernlund s Customer Service Department toll free at 1 800 255 4208 for assistance IMPORTANT If the call for heat interlock signal or 115 VAC power is removed the UC1 boa...

Страница 7: ...heaters To interlock a millivolt water heater and a 24 115 VAC furnace or boiler add the WHKE and MAC1E MILLIVOLT HEATER INSTALLATIONS Each millivolt appliance interlocked with the UC1 must have its o...

Страница 8: ...arity sensitive NOTE If burner safety control goes out on lockout the Inducer will continue to run as long as a call for heat is present UC1 UNIVERSAL CONTROL CONNECTED WITH A 24 VAC ELECTRONIC IGNITI...

Страница 9: ...und wires in UCRT to supply ground Important Installer must supply overload and disconnect protection 5 If not previously completed connect Black White and Red leads from UCRT to like colors in Roofto...

Страница 10: ...ol goes out on lockout the Inducer will continue to run as long as a call for heat is present UC1 UNIVERSAL CONTROL CONNECTED TO A HONEYWELL R7184 SERIES OR EQUIVALENT PRIMARY CONTROL WITH A LINE VOLT...

Страница 11: ...lue and Yellow leads from UCRT to PSA 1 Fan Prover switch Prover Leads are not polarity sensitive NOTE If burner safety control goes out on lockout the Inducer will continue to run as long as a call f...

Страница 12: ...to the ground screw in the Rooftop Inducer whip 4x4 weatherproof box Connect Blue and Yellow leads from UCRT to PSA 1 Fan Prover switch Prover Leads are not polarity sensitive UC1 UNIVERSAL CONTROL C...

Страница 13: ...that a slight positive draft neutral to 0 01 W C or 2 5 Pa is measured at the appliance draft sampling location Flue gases should just start to spill from the draft hood draft diverter or barometric d...

Страница 14: ...original position the fault code will be cleared NOTE The UC1 board must have its 115 VAC power supply present when any of the 1 8 dip switches are moved back to their original position for the fault...

Страница 15: ...4 Red will be reset if the call for heat interlock signal or 115 VAC power is removed If the fan prover makes on start up but breaks for more than 10 seconds during the burner cycle LED 4 will flash...

Страница 16: ...ined return it to your Tjernlund distributor for replacement Please include UCRT date code component was taken from The date code is located on the Electrical Box coverplate If the date code is older...

Отзывы: