background image

6

INDUCER GROUND, MOTOR AND PROVER SAFETY CIRCUIT CONNECTIONS

ROOFTOP INDUCER PSA-1 FAN PROVER CONNECTIONS

The Blue and Yellow leads from UC1 (P1 and P2) safety circuit must be connected to the PSA-1 Fan Prover switch. Leads are not
polarity sensitive.  When venting 

only

millivolt appliances, the PSA-1 Fan Prover is not needed. See WHKE manual or consult factory.

1

ROOFTOP INDUCER MOTOR AND COOLING FAN CONNECTIONS

Connect Black and Red leads from UCRT to like colors in Rooftop Inducer whip 4x4 weatherproof junction box. Connect White
wire from UCRT to White & White/Red Sriped wire in Rooftop Inducer whip 4x4 weatherproof junction box. 

UCRT / ROOFTOP INDUCER GROUND CONNECTIONS

Connect the two Green ground leads within the UCRT to the ground of the power supply service panel. Connect the 
Green/Yellow Striped lead to the Green ground screw within the Rooftop Inducer whip 4x4 weatherproof junction box.

MULTIPLE APPLIANCE INTERLOCKS

To interlock with one additional 24/115 VAC heater add the MAC1E.  It is a stripped down auxiliary board version of the UC1 and
is powered by and communicates with the UC1 through a factory wired whip.

To interlock more than two 24/115 VAC heaters, add the MAC4E for a total of up to 5 heaters.  It is powered by and communicates
with the UC1 through a factory wired whip.  Consult factory for installations with more than 5 heaters.  

To interlock a millivolt water heater and a 24/115 VAC furnace or boiler, add the WHKE and MAC1E.

MILLIVOLT HEATER INSTALLATIONS 

Each millivolt appliance interlocked with the UC1 must have its own WHKE kit installed.  The WHKE Gas Pressure Switch actuates
the Inducer through the A - B Dry contacts.  The Linear Limit switch disables the heater in the event of a venting malfunction.

IMPORTANT

: Each millivolt appliance interlocked with the UC1 must have its own Linear Limit spill switch.

MULTIPLE MILLIVOLT HEATER INSTALLATIONS

Multiple millivolt heaters can be installed by using the A-B dry contact terminals of the UC1, MAC1E or MAC4E.  Wire each WHKE
gas pressure switch in parallel across A-B terminals of UC1, MAC1E or MAC4E.  Wire Linear Limit safety switch into each individ-
ual millivolt heater.  For further information consult factory or WHKE instructions.

FIGURE 8052075     5-19-11

MOTOR

CAPACITOR

GROUND

BLACK

RED

BROWN

WHITE / RED

COOLING FAN

THERMOSTAT

INDUCER

MOTOR

THERMOSTAT

WHT

 / RE

D

BL

AC

K

BR

OW

N

OR

AN

GE

BR

OW

N

RE

D

NUT

S

OR

AN

GE

BL

AC

K

RE

D

WHT

 / RE

D

WHI

TE

WHI

TE

BLUE

BLUE

BLACK

4 FT. WHIP

PRE-WIRED

INCLUDED 4 X 4 BOX

IMPELLER

WI

RE

BLACK

INCLUDED

ORANGE

SIDE VIEW

CUTAWAY

RT SERIES

WHITE

OFF

SPEED

CONTROL

CONTROL OPTION 4

HEATING APPLIANCE INTERLOCK USING UCRT

ON

LOW

ON

HIGH

(BLACK)

(WHITE)

L1

N

115 VAC

RED

BLACK

GND

N

L

N

M

MTR

P2

P1

CONTROL

TJERNLUND UCRT

INTERLOCK OPTIONS

INSTRUCTIONS FOR

SEE UCRT

PSA-1

TJERNLUND

WHITE

XN

XL

5 VDC BOARD-GENERATED POWER.

115 VAC

LEGEND

DO NOT SUPPLY POWER!

RED

YELLOW

BLUE

6 AMPS MAX

GREEN/YELLOW

GREEN

GREEN

GND

Содержание UCRT

Страница 1: ...ESE INSTRUCTIONS MAY RESULT IN IMPROPER INSTALLATION ADJUST MENT SERVICE OR MAINTENANCE POSSIBLY RESULTING IN FIRE ELECTRI CAL SHOCK CARBON MONOXIDE POISONING EXPLOSION PERSONAL INJURY OR PROPERTY DAM...

Страница 2: ...ight carrier and your distributor immediately and file a concealed damage claim INSTALLATION RESTRICTIONS 1 The Pre Cycle Prover Status Check is deactivated from the factory on the UCRT Natural chimne...

Страница 3: ...ED POWER LED DRY 24 V 115 V APPLIANCE INTERLOCK RELAY INDUCER MOTOR RELAY A B 1 2 3 4 L N J1 J2 XL XN P1 P2 C GND F 1 9 N M MTR J1 J2 CALL JUMPER Used when the call signal is used as the proven return...

Страница 4: ...be cleared NOTE The UC1 board must have its 115 VAC power supply present when any of the 1 8 dip switches are moved back to their original position for the fault code to clear PRE POST PURGE AND PROVE...

Страница 5: ...VOLTAGE SOURCE IS PROVIDED TO TERMINAL 3 120 VAC 10 50 60 Hz MOTOR 1 H P MAX 120 VAC 50 60 Hz USER PROVIDED 24 VAC AT TERMINALS 1 2 1 CALL HOT 2 COMMON CONTROL REQUIRES 5 mA 24 VAC TO TRIGGER MOVE RE...

Страница 6: ...ed in these instructions call Tjernlund s Customer Service Department toll free at 1 800 255 4208 for assistance IMPORTANT If the call for heat interlock signal or 115 VAC power is removed the UC1 boa...

Страница 7: ...heaters To interlock a millivolt water heater and a 24 115 VAC furnace or boiler add the WHKE and MAC1E MILLIVOLT HEATER INSTALLATIONS Each millivolt appliance interlocked with the UC1 must have its o...

Страница 8: ...arity sensitive NOTE If burner safety control goes out on lockout the Inducer will continue to run as long as a call for heat is present UC1 UNIVERSAL CONTROL CONNECTED WITH A 24 VAC ELECTRONIC IGNITI...

Страница 9: ...und wires in UCRT to supply ground Important Installer must supply overload and disconnect protection 5 If not previously completed connect Black White and Red leads from UCRT to like colors in Roofto...

Страница 10: ...ol goes out on lockout the Inducer will continue to run as long as a call for heat is present UC1 UNIVERSAL CONTROL CONNECTED TO A HONEYWELL R7184 SERIES OR EQUIVALENT PRIMARY CONTROL WITH A LINE VOLT...

Страница 11: ...lue and Yellow leads from UCRT to PSA 1 Fan Prover switch Prover Leads are not polarity sensitive NOTE If burner safety control goes out on lockout the Inducer will continue to run as long as a call f...

Страница 12: ...to the ground screw in the Rooftop Inducer whip 4x4 weatherproof box Connect Blue and Yellow leads from UCRT to PSA 1 Fan Prover switch Prover Leads are not polarity sensitive UC1 UNIVERSAL CONTROL C...

Страница 13: ...that a slight positive draft neutral to 0 01 W C or 2 5 Pa is measured at the appliance draft sampling location Flue gases should just start to spill from the draft hood draft diverter or barometric d...

Страница 14: ...original position the fault code will be cleared NOTE The UC1 board must have its 115 VAC power supply present when any of the 1 8 dip switches are moved back to their original position for the fault...

Страница 15: ...4 Red will be reset if the call for heat interlock signal or 115 VAC power is removed If the fan prover makes on start up but breaks for more than 10 seconds during the burner cycle LED 4 will flash...

Страница 16: ...ined return it to your Tjernlund distributor for replacement Please include UCRT date code component was taken from The date code is located on the Electrical Box coverplate If the date code is older...

Отзывы: