9 SPEED BENCH PILLAR DRILL
SF16N-9
OPERATION INSTRUCTIONS
WARNING: Before using your drill
press,read the instruction manual
carefully.
1.UNPACKING YOUR MACHINE
Carefully unpack all the content and lay them
out on the floor. Check contents against check
list below. Retain packaging until all parts are
accounted for and assembly has been complete.
Lift out base plate and remove protective paper
and place on workbench.
Inside the small box you will find the chuck,
three handles, three set bolts, three washers,
two hexagonal keys and chuck key. Place on
workbench.
Lift worktable out and remove protective paper.
Put on workbench. Remove headstock and motor
assembly and put on workbench. Remove column
and plastic guard. Put plastic guard away for time
being.
2.ASSEMBLY
(See Fig 1-3)
Assemble the machine as follows:
- Position the machine base (1).
- Fasten the pillar (2) to machine base (1) using
three screws (3) and washers.
- Push the drill table (4) onto the pillar (2) (fig 3).
- Lock the drill table into the desired position
using the clamping screw (5).
- Place the drill head (6) with pulley cover (7) and
motor (8) onto the pillar and fasten using the
head lock screw (19).
- Screw the three grip knobs (9) onto the feeder
cross handle.
Note:
All bare parts are greased in order to
protect them from corrosion. Before mounting
the drill chuck (10) onto the spindle (11), both
parts must be completely degreased using an
environmentally friendly solvent. This ensures
optimal transmission of power.
- Mount the drill chuck onto the spindle.
3.INSTALLING THE MACHINE
(See Fig 3)
Before the drill is started for the first time, it must
be solidly and fully mounted on the work area
of a stable workbench. Select suitable length
bolts, washers and nuts (not supplied). Use four
mounting holes (12) in the base plate to do this.
Ensure that the machine is freely accessible for
Fig 2
Fig 3
Содержание SF16N-9
Страница 1: ...9 SPEED BENCH PILLAR DRILL SF16N 9 SAFETY AND OPERATING MANUAL ...
Страница 17: ......