background image

4

5. Installation 

•  Ensure the mains supply is switched off and the circuit supply fuses  

are removed or the circuit breaker turned off.

•  An isolating switch should be installed to enable the power to be switched  

ON and OFF for maintenance purposes and to activate the manual/auto  
override function. 

•  Remove the back plate from the PIR light controller.

Insert flat blade screwdriver under 
tab and lever in direction 1

•  Mark the position of the mounting holes using the back plate as a template. 

Drill out the mounting holes taking care to avoid any joists, electrical cables  
or water/gas pipes that may be hidden beneath the surface.  
Insert the rawl plugs into the holes.

•  Pass the 230V 50Hz mains supply and load cables through the cable entry  

point on the back plate, ensuring the grommet(s) is used to maintain the  
IP rating of the PIR light controller.

•  Fix the back plate to the wall. Take care not to over-tighten the screws  

to prevent damage to the back plate. If using a power screwdriver,  
use the lowest torque setting.

Содержание SureTime STLB1000

Страница 1: ...I n s t a l l a t i o n O p e r a t i n g I n s t r u c t i o n s 180 PIR Light Controller Model STLB1000 Black Model STLW1000 White...

Страница 2: ...d the circuit supply fuses are removed or the circuit breaker turned off It is recommended that a qualified electrician is consulted or used for the installation of this PIR light controller and insta...

Страница 3: ...t 10 to 1000 Lux Day and night or night time only operation Pan Tilt Adjustment Pan left and right 45 Tilt down 35 Manual Override 6 hours max Warm up Time 60 seconds Operating Temperature 20 C to 40...

Страница 4: ...TOWARDS See image B Therefore position the unit so that the sensor looks ACROSS the likely approach path Avoid positioning the sensor where there are any sources of heat in the detection area extracto...

Страница 5: ...tion 1 Mark the position of the mounting holes using the back plate as a template Drill out the mounting holes taking care to avoid any joists electrical cables or water gas pipes that may be hidden b...

Страница 6: ...rect polarity is observed and that all bare conductors are sleeved See section 6 Connection Diagram Line the PIR light controller up with the back plate apply pressure to both sides of the unit until...

Страница 7: ...V 50Hz mains supply and load cables into the terminal block as follows 230V 50Hz Mains Supply Live Supply Brown or Red to L Neutral Supply Blue or Black to N Load Light Source Switch Live Brown or Red...

Страница 8: ...ockwise Dusk Lux level setting fully clockwise Turn the power to the unit ON The lamp will immediately illuminate as the unit goes through its warm up period After approximately 1 minute the lamp will...

Страница 9: ...s reached where the lamp illuminates 3 Leave the control knob set at this point At this position the unit should become operative at approximately the same level of darkness each evening Observe the o...

Страница 10: ...witched ON at the power supply or isolation switch Turn OFF the power to the unit and check the wiring connections Check the lamp if it s changeable If the lamp has failed replace Ensure the lamp is s...

Страница 11: ...arantee In the unlikely event of this product becoming faulty due to defective material or manufacture within 2 years of the date of purchase please return it to your supplier in the first year with p...

Страница 12: ...l csc timeguard com For a product brochure please contact If you experience problems do not immediately return the unit to the store Telephone the Timeguard Customer Helpline Qualified Customer Suppor...

Отзывы: