background image

3

4

4. Selecting a Location

•  The motion detector has number of detection zones, at various vertical and 

horizontal angles as shown (See image “A”).

•  The best all-round coverage is achieved with the unit mounted at the optimum 

height of 2.5 metres.

•  Careful positioning of the sensor will be required to ensure optimum 

performance (see image “A” and “B” detailing detection range and direction).

•  The sensor is more sensitive to movement ACROSS its field of vision than  

to movement directly TOWARDS (See image “B”). Therefore position the unit  
so that the sensor looks ACROSS the likely approach path.

•  Avoid positioning the sensor where there are any sources of heat in the 

detection area (extractor fans, tumble dryer exhausts etc.) including opposite 
any other light sources such as other security lights.

•  Reflective surfaces (i.e. pools of water or white painted walls) and overhanging 

branches may cause false activation under extreme conditions.

•  During extreme weather conditions the motion sensor may exhibit unusual 

behaviour. This does not indicate a fault with the PIR light controller. Once normal  
weather conditions return, the sensor will resume normal operation.

A

B

Содержание SureTime STLB1000

Страница 1: ...I n s t a l l a t i o n O p e r a t i n g I n s t r u c t i o n s 180 PIR Light Controller Model STLB1000 Black Model STLW1000 White...

Страница 2: ...d the circuit supply fuses are removed or the circuit breaker turned off It is recommended that a qualified electrician is consulted or used for the installation of this PIR light controller and insta...

Страница 3: ...t 10 to 1000 Lux Day and night or night time only operation Pan Tilt Adjustment Pan left and right 45 Tilt down 35 Manual Override 6 hours max Warm up Time 60 seconds Operating Temperature 20 C to 40...

Страница 4: ...TOWARDS See image B Therefore position the unit so that the sensor looks ACROSS the likely approach path Avoid positioning the sensor where there are any sources of heat in the detection area extracto...

Страница 5: ...tion 1 Mark the position of the mounting holes using the back plate as a template Drill out the mounting holes taking care to avoid any joists electrical cables or water gas pipes that may be hidden b...

Страница 6: ...rect polarity is observed and that all bare conductors are sleeved See section 6 Connection Diagram Line the PIR light controller up with the back plate apply pressure to both sides of the unit until...

Страница 7: ...V 50Hz mains supply and load cables into the terminal block as follows 230V 50Hz Mains Supply Live Supply Brown or Red to L Neutral Supply Blue or Black to N Load Light Source Switch Live Brown or Red...

Страница 8: ...ockwise Dusk Lux level setting fully clockwise Turn the power to the unit ON The lamp will immediately illuminate as the unit goes through its warm up period After approximately 1 minute the lamp will...

Страница 9: ...s reached where the lamp illuminates 3 Leave the control knob set at this point At this position the unit should become operative at approximately the same level of darkness each evening Observe the o...

Страница 10: ...witched ON at the power supply or isolation switch Turn OFF the power to the unit and check the wiring connections Check the lamp if it s changeable If the lamp has failed replace Ensure the lamp is s...

Страница 11: ...arantee In the unlikely event of this product becoming faulty due to defective material or manufacture within 2 years of the date of purchase please return it to your supplier in the first year with p...

Страница 12: ...l csc timeguard com For a product brochure please contact If you experience problems do not immediately return the unit to the store Telephone the Timeguard Customer Helpline Qualified Customer Suppor...

Отзывы: