Use and Maintenance Manual - X Series
Page
31
4.
INSTALLATION AND PRELIMINARY CHECKS
The machine is supplied completely assembled, therefore it can perform all functions in safety as provided for by the manufacturer.
No preliminary operation is required. To unload the machine, follow the instructions in chapter “Handling and carrying”.
Place the machine on a sturdy enough surface (see paragraph
3.3.5
) and with a gradient below max. allowed gradient (see
technical features “Stability limits”).
4.1
Becoming acquainted with the machine
Anyone wishing to use a machine with weight, height, width and length characteristics or which generally differs significantly from
the training received must be updated in order to cover the differences.
The employer shall be responsible for ensuring all the operators who use work equipment are adequately trained and in order with
applicable health and safety legislation.
4.2
Preliminary operation checks
Before using the machine read the instructions given in this manual and the concise instructions indicated on the platform plate.
Check the perfect integrity of the machine (by sight check) and read the plates showing machine operating limits.
Before using the machine the operator must always check visually that:
The battery is completely charged.
The oil level lies between the min. and max. value (with lowered platform).
The ground is sufficiently horizontal and solid.
The machine carries out all operations in safety.
The wheels and drive motors are properly fixed.
The wheels are in good condition.
Make sure the guard rails are fastened to the platform and the gate/s are in automatic reclosing mode.
The structure does not show clear faults (visually check welding of lifting structure).
The instructions plates are perfectly readable.
The platform control panel and the ground emergency control panel, dead-man system included, are perfectly efficient.
Do not use the machine for purposes different from those it was intended for.
Содержание Airo X Series
Страница 46: ...Use and Maintenance Manual X Series Page 46 GUARD RAILS FOLDING DOWN SEQUENCE 1 2 3 4 5 6 7 8 9 10...
Страница 70: ...Use and Maintenance Manual X Series Page 70...
Страница 94: ...Uso e manutenzione Serie X Pag 94 045 07 001...
Страница 103: ...Uso e manutenzione Serie X Pag 103 049 07 001...
Страница 112: ...Uso e manutenzione Serie X Pag 112 045 08 011 045 08 012...
Страница 113: ...Uso e manutenzione Serie X Pag 113...
Страница 114: ...Uso e manutenzione Serie X Pag 114...
Страница 115: ...Uso e manutenzione Serie X Pag 115...