OPERATION
© 2020 Alamo Group Inc.
OPERA
TION
Weedoo Sickle Bar Mower Operation Section 3-7
TRANSPORTING MOWER
Transporting under the unit’s own power:
When transporting between job sites or between cutting passes, the following procedure should be followed: Shut
off the power to the cutting head and allow all motion to come to a complete stop. Raise the boom above ground
material or foilage, being cautious of overhead obstructions such as highline wires. Tilt the deck completely
towards the secondary boom. Stow the boom in the boomrest. Secure the sickle bar mower.
Transporting unit by trailer:
Shut off the power to the cutting head and allow all motion to come to a complete stop. Raise the boom above
ground material or foilage, being cautious of overhead obstructions such as highline wires. Tilt the deck completely
towards the secondary boom. Stow the boom in the boomrest. Secure the sickle bar mower. Move the boat
onto the center of the trailer to avoid uneven distribution of weight and staying within local width restrictions. Tie
down the boat as needed.
Retract swivel cylinder and place clear of boom. Pivot boom forward to the center of flat bed. Lower deck onto the
trailer bed, and shut off the tractor. The boat and the mower head should now be chained down securely to the
trailer bed.
If any part of this Operation Section, or any other section of this manual is not completely
understood, contact your Tiger dealer or the address on the cover of this manual for
assistance.
CAUTION!
Содержание 06090005
Страница 4: ......
Страница 6: ......
Страница 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Страница 19: ...SAFETY 12 10 Safety Section 1 13 2010 Alamo Group Inc SAFETY Decal Description...
Страница 20: ...SAFETY 12 10 Safety Section 1 14 2010 Alamo Group Inc SAFETY...
Страница 21: ...SAFETY 12 10 Safety Section 1 15 2010 Alamo Group Inc SAFETY...
Страница 22: ...SAFETY 12 10 Safety Section 1 16 2010 Alamo Group Inc SAFETY...
Страница 23: ...SAFETY 12 10 Safety Section 1 17 2010 Alamo Group Inc SAFETY...
Страница 25: ...ASSEMBLY SECTION 2018 Alamo Group Inc Assembly Section 2 1...
Страница 27: ...ASSEMBLY 2019 Alamo Group Inc ASSEMBLY Assembly Section 2 3...
Страница 28: ...ASSEMBLY 2019 Alamo Group Inc ASSEMBLY Assembly Section 2 4...
Страница 30: ...ASSEMBLY 2019 Alamo Group Inc ASSEMBLY Assembly Section 2 6...
Страница 31: ...OPERATION SECTION 2018 Alamo Group Inc Boom Operation Section...
Страница 39: ...MAINTENANCE SECTION 2020 Alamo Group Inc Weedoo Sickle Bar Maintenance Section 3 1...
Страница 49: ...PARTS SECTION WEEDOO SICKLE BAR MOWER...
Страница 51: ...PARTS ORDERING GUIDE 2020 Alamo Group Inc Parts Section 3 Weedoo Sickle Bar Mower...
Страница 52: ...WEEDOO MAIN ASSEMBLY 2020 Alamo Group Inc Parts Section 4 Weedoo Sickle Bar Mower...
Страница 54: ...WEEDOO HYDRAULIC ASSEMBLY 2020 Alamo Group Inc Parts Section 6 Weedoo Sickle Bar Mower...
Страница 56: ...WEEDOO HYDRAULIC ROUTING 2020 Alamo Group Inc Parts Section 8 Weedoo Sickle Bar Mower...
Страница 60: ...KNIFE ASSEMBLY 2020 Alamo Group Inc Parts Section 12 Weedoo Sickle Bar Mower...
Страница 62: ...NOTES 2020 Alamo Group Inc Parts Section 14 Weedoo Sickle Bar Mower...
Страница 63: ...WARRANTY SECTION Warranty Section 7 1...
Страница 64: ......
Страница 68: ...Printed in USA Tiger Corporation...