OPERATION
© 2020 Alamo Group Inc.
OPERA
TION
Weedoo Sickle Bar Mower Operation Section 3-4
LEARNING BOOM AND MOWER OPERATION
Start the motor and allow the engine to stabilize. Without starting the mower, practice positioning the boom and
mower. Remember, speed and skill will be attained easier if the necessary time is spent familiarizing yourself
with the machine and its operations. When you feel comfortable at controlling the position of the mower, return
the mower to the travel position, and transport the mower to the desired mowing location.
If mowing for the first time, we recommend choosing a shore area relatively flat with a minimum of sign posts,
guard rails, etc. As always, you should inspect the area for other objects that can cause potential hazards and
removing them before mowing.
VALVE CONTROLS
A control lever decal similar to the one shown below should be near the control valve to remind the operator of
the lever functions.
The main control valve on the Tiger Boom Mower has four sections with tapered spools, located near the driver’s
seat. The malfunction of a section of the valve does not necessitate the replacement of the entire “bank”, only the
faulty section. Each section of the valve controls a certain position of the boom or mower. Seated in the operator’s
seat, the controls from left to right are #1 - primary(main) boom, #2 – secondary boom, #3 – mower tilt, #4 – motor
on-off.
Содержание 06090005
Страница 4: ......
Страница 6: ......
Страница 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Страница 19: ...SAFETY 12 10 Safety Section 1 13 2010 Alamo Group Inc SAFETY Decal Description...
Страница 20: ...SAFETY 12 10 Safety Section 1 14 2010 Alamo Group Inc SAFETY...
Страница 21: ...SAFETY 12 10 Safety Section 1 15 2010 Alamo Group Inc SAFETY...
Страница 22: ...SAFETY 12 10 Safety Section 1 16 2010 Alamo Group Inc SAFETY...
Страница 23: ...SAFETY 12 10 Safety Section 1 17 2010 Alamo Group Inc SAFETY...
Страница 25: ...ASSEMBLY SECTION 2018 Alamo Group Inc Assembly Section 2 1...
Страница 27: ...ASSEMBLY 2019 Alamo Group Inc ASSEMBLY Assembly Section 2 3...
Страница 28: ...ASSEMBLY 2019 Alamo Group Inc ASSEMBLY Assembly Section 2 4...
Страница 30: ...ASSEMBLY 2019 Alamo Group Inc ASSEMBLY Assembly Section 2 6...
Страница 31: ...OPERATION SECTION 2018 Alamo Group Inc Boom Operation Section...
Страница 39: ...MAINTENANCE SECTION 2020 Alamo Group Inc Weedoo Sickle Bar Maintenance Section 3 1...
Страница 49: ...PARTS SECTION WEEDOO SICKLE BAR MOWER...
Страница 51: ...PARTS ORDERING GUIDE 2020 Alamo Group Inc Parts Section 3 Weedoo Sickle Bar Mower...
Страница 52: ...WEEDOO MAIN ASSEMBLY 2020 Alamo Group Inc Parts Section 4 Weedoo Sickle Bar Mower...
Страница 54: ...WEEDOO HYDRAULIC ASSEMBLY 2020 Alamo Group Inc Parts Section 6 Weedoo Sickle Bar Mower...
Страница 56: ...WEEDOO HYDRAULIC ROUTING 2020 Alamo Group Inc Parts Section 8 Weedoo Sickle Bar Mower...
Страница 60: ...KNIFE ASSEMBLY 2020 Alamo Group Inc Parts Section 12 Weedoo Sickle Bar Mower...
Страница 62: ...NOTES 2020 Alamo Group Inc Parts Section 14 Weedoo Sickle Bar Mower...
Страница 63: ...WARRANTY SECTION Warranty Section 7 1...
Страница 64: ......
Страница 68: ...Printed in USA Tiger Corporation...