3
TIE DOWN
Safety Products Division
800-241-1806 • 404-344-0000 • www.tiedown.com
E1821, Rev. 3/2/21
Slab Gripper
0”
24” Max.
Locking Pin
12”
12”
Nail Holes
0”
24” Max.
Locking Pin
12”
12”
Nail Holes
10. Rotate Adjustment Handle counter-clockwise until
Slab Clamp fits over the concrete slab. Slab
Gripper can adjust to fit concrete beams from
1-1/2” to 24” thick.
11. Insert Locking Pin into first available hole in Slab
Gripper Post.
12. Repeat steps #9-11 for all Slab Grippers.
13. Rotate Adjustment Handle clockwise until snug.
If tightening with a torque tool, tighten to no more
than 30 foot-pounds. Guardrail rungs must always
face towards work surface.
14. Install 2” x 4” guardrail boards in Guardrail Rungs.
Guardrails must overlap by a minimum of 12” at
each end.
15. Use nails, deemed compatible by a Competent
Person, to install all toeboards to Toeboard Plates.