background image

3

TIE DOWN 

Safety Products Division

800-241-1806   •   404-344-0000  •  www.tiedown.com

E1821, Rev.  3/2/21

Slab Gripper

0”

24” Max.

Locking Pin

12”

12”

Nail Holes

0”

24” Max.

Locking Pin

12”

12”

Nail Holes

10.  Rotate Adjustment Handle counter-clockwise until
 

Slab Clamp fits over the concrete slab. Slab

         Gripper can adjust to fit concrete beams from 
         1-1/2” to 24”  thick.

11.  Insert Locking Pin into first available hole in Slab  
        Gripper Post. 

12.   Repeat steps #9-11 for all Slab Grippers.

13.  Rotate Adjustment Handle clockwise until snug.
 

If tightening with a torque tool, tighten to no more 

        than 30 foot-pounds. Guardrail rungs must always 
        face towards work surface.

14.  Install 2” x 4” guardrail boards in Guardrail Rungs.  
 

Guardrails must overlap by a minimum of 12” at    

 

each end.

15.  Use nails, deemed compatible by a Competent    
 

Person, to install all toeboards to Toeboard Plates.

Отзывы: