www.maxcessintl.com
Tidland Leaf Shaft
MI 27L691995 1 L
Page 12
MAINTENANCE
Shaft Assembly Sequence
Note: O-ring configurations vary. Make sure there is an o-
ring in each groove before re-assembly.
1. Apply o-ring grease to the o-rings on the o-ring connector.
2. Insert the rubber tube assembly into the valve journal and
push the valve end tube fitting fully over the
o-ring connector in the valve journal.
3. Apply o-ring grease to the fit area of the valve journal.
4. Insert the non-valve end of the rubber tube assembly into
the shaft. Slide it all the way in until it seats in the recess
(tube socket) in the non-valve journal.
5. Align the match marks on valve journal and shaft
and tap the journal into place with a rubber mallet.
6. Apply small amount of
low-strength
threadlocker to threads
of the journal set screws. Reinstall the set screws and
torque as shown in the chart below.
7. Reinstall the valve:
a. Apply a thread sealant (according to the
manufacturer's directions) to threads of the valve.
b. Screw the valve into the shaft and torque to
8.8-10 ft·lbs (12-13.6 Nm).
Torque Requirements
Setscrew Torque Requirements
Assembly Torque Requirements
for Standard Tube Fittings
Size
US
ft·lbs
steel
body
ft·lbs
aluminum
body
Size
Metric
Nm
steel
body
Nm
aluminum
body
Tube
O.D.
ft·lbs
Tube
O.D.
Nm
1/4"
6-7
2-3
M6
9-10
3-4
1-1/4"
28-30
32mm
38-41
5/16"
12-14
4-5
M8
16-18
5-6
1-3/8"
38-40
35mm
51-54
3/8"
22-24
7-8
M10
30-32
10-11
1-1/2"
43-45
38mm
58-61
1/2"
47-52
15-17
M12
62-69
20-23
1-5/8"
43-45
41mm
58-61
1-7/8"
48-50
48mm
65-68
2-1/8"
53-55
54mm
72-75
2-3/8"
58-60
60mm
79-82
3-3/8"
63-65
86mm
85-88
4"
68-70
102mm
92-95
4-3/8"
78-80
111mm
105-108
4-1/2"
78-80
114mm
105-108
O-RING CONNECTOR
RUBBER TUBE ASSEMBLY
RUBBER TUBE ASSEMBLY
RECESS
MATCH MARK
SET SCREWS