ThoroughClean D10i-36C Скачать руководство пользователя страница 10

HOW TO CAUSE EXPENSIVE DAMAGE TO YOUR MACHINE

 

WHAT WAS DONE WRONG:  WHAT WAS THE RESULT OF THIS ACTION: 

Machine was allowed to run dry 

(without water supply) 

Cracked and burnt high pressure seals in pump. 
No. 1 piston cracked due to thermal shock. 

Unit was run on low volume 

water supply and allowed to 

cavitate 

Mechanical damages to EVERYTHING: 

-          Pistol, HP hose, pump valves, pistons 

-          Crankshaft bearing failure 
-          Pressure gauge failure 
-          By-pass valve excessive wear & tear 

-          Frequent O-rings blow outs 
-          Brass heads deformed 

Over adjust by-pass valve to try 

and increase PSI 

Dump pressure was too high. Hydraulic hammer to system every 

time trigger is closed. PSI was increased 5-fold normal working 

pressure. 

In-Line filter was removed 

because “It kept blocking up!” 

Excessive wear & tear on pistons / valves / seals / HP jets. 
Excessive blocking of filters caused by bore or recycled water with 

high salt / mineral content. Pump clogged up with debris. 

Remember: Spec requirement says: “Potable water” 

Over-revved engine for more PSI  Engine & Pump premature wear & tear. (Most increased PSI  

pressure is lost through by-pass valve and only small increase in 

pressure is achieved doing this!) Lost of waster horse power! 

COMMON MISTAKE:

 Put a 

smaller HP Jet onto lance for 

higher pressure.

 

When orifice is reduced, the PSI will rise and then by-pass valve will 

dump (thinking the pistol is shut). Most extra PSI will be dumped and 

only a slight increase in PSI will be achieved. 
Engine, By-pass valve & Pump premature wear & tear.   

Using Contaminated Fuel (“Had 

to remove fuel filter to keep 

engine running!”) 

Excess Fuel-system clean-outs required. If excessive corrosion in 

carburetor or injectors is detected after the 2nd or 3rd in-line fuel 

filter replacement, then this should ring alarm bells. 

Park machine where debris 

blows all over it. Reverse 

bulldozer over it. 

Our machines are rugged and strong – but not battle tanks! 

Hire units long-terms and fluid 

levels are not checked. 

Con-rod through the crank case! 

Modify 240 Volt electric unit to 

override thermal overload on 

motor. 

Stop-Start capacitors melted. 

Used 100m extension lead and a 

5 Kva Gen-Set. 

A 10% low current is equivalent to a 50% over-load. 

  

Our 3 HP 240 Volt motors require 8 Kva Gen-Set minimum! 

Run trucks, fork-lifts, tracked 

excavation equipment over 

hoses and lance 

assemblies/pressure guns. 

Needs replacing of damaged parts 

 

10 

Содержание D10i-36C

Страница 1: ...ndex Page 2 Technical data Specifications 3 Installation Start up 4 Operating Tips Shutting down Regular Checks 5 6 Maintenance Schedule 8 9 Trouble Shooting Guide 10 What can cause expensive damage t...

Страница 2: ...00 psi 15 lpm 3000 psi 15 lpm 3000 psi 15 lpm Nozzle size at set up pressure 15045 15045 15045 15045 Pump Speed RPM 1450 1450 1450 1450 Hour Meter Engine Pump vibe mounted Pump protected by LubeBuddy...

Страница 3: ...there are no kinks in it Trigger gun to expel any air in the system LAST CHECKS START Check all hoses are connected and check for damage or water leaks Check oil level in the pump The oil sight glass...

Страница 4: ...vy soil or dirt build up The unit comes standard with a 15 degree nozzle correctly sized for the pressure and flow for your machine Always use the same size nozzle NEW to test the machine for performa...

Страница 5: ...diately Do not use extension cords on these units plug straight into wall socket SAFETY Ensure safety protective gear is used and in good state of repair Ensure Safety MEDIC ALERT Card is handy Prolon...

Страница 6: ...3 pump Replace Brass Valves 6 pump Replace various seals 3 pump Replace Ceramic Piston Plungers if cracked or worn 3 pump Only if required 12 Check By Pass valve function test re kit or replace if req...

Страница 7: ...uneconomical to repair Replace as necessary Remember to check filters regularly and clean under running water The correct procedure for replacing the filter mesh in the small black filters vs the larg...

Страница 8: ...k suction hose Increase diameter size for bigger supply Damaged ceramic plunger Replace Plunger Excessive pressure and or temp in the pumped water Check the temperature and pressure of inlet water SHO...

Страница 9: ...eals Worn Cracked Piston Check Replace Water Blasted into Pump via Breather Cap during Cleaning Exercise Care WATER DRIPPING FROM UNDER PUMP Between crankcase and manifold housing H P Piston Seals Wor...

Страница 10: ...t through by pass valve and only small increase in pressure is achieved doing this Lost of waster horse power COMMON MISTAKE Put a smaller HP Jet onto lance for higher pressure When orifice is reduced...

Страница 11: ...etration would be detrimental NEVER WATER BLAST fragile items surfaces that may be damaged by high velocity water Always carefully test on a small area first ALWAYS WEAR PROTECTIVE GEAR PPE i e Head f...

Страница 12: ...t task was being performed at the time of the injury making special note of any chemicals that were used and the quality of the water MEDIC ALERT INFORMATION ALWAYS ENSURE MACHINE IS FITTED WITH A REM...

Страница 13: ...tion for any other reasonably foreseeable loss or damage You are also entitled to have the goods repaired or replaced if goods fail to be of acceptable quality and the failure does not amount to a maj...

Страница 14: ...period THIS WARRANTY WILL NOT APPLY TO Any part component that has been subject to misuse negligence accidental damage improper or inadequate maintenance or improper storage Any part that has been sub...

Страница 15: ...he required flow of the pressure pump specification and suitable power supply outlet for electrical units where applicable 8 No responsibility will be taken for late delivery day due to unforeseen cir...

Страница 16: ...6 38 37 34 26 40 41 42 1 29 33 6 10 9 8 13 12 14 20 19 11 43 44 45 48 31 32 23 16 25 30 15 16 17 18 27 46 47 24 3 28 7 4 2 26 25 23 16 21 22 13 14 11 18 12 5 Hawk NPM1525 serie 2011 NPM1525 pump 2011...

Страница 17: ......

Страница 18: ...02 00 Valve plate 6 21 0900 30 Valve spring 6 22 0604 05 Valve cage 6 23 1802 03 Hexagonal screw M8x18 8 24 0500 61 Closed bearing housing 1 25 0601 63 O Ring 1 78x60 05 2 26 0200 06 Roller bearing 33...

Страница 19: ...Seals 18 mm 1 2600 37 Complete Seals Packing 18 mm 3 2612 42 Plunger 18 mm 3 2600 08 Complete Valve 6 2608 03 Plunger oil Seals 1 2600 75 Complete Manifold 1 3100 13 Connecting Rod Plunger Rod Assy 3...

Страница 20: ...3 6 6 10 8 GPM 0 3000 PSI Features all stainless and brass internal parts New design reduces sensitivity to entrapped air No external moving parts or springs Unique barb and flow balance design provid...

Страница 21: ...3 15 16 22 24 25 28 29 INSTALLATION Select an unloader appropriate for the pressure and flow of your system see specification chart This unloading valve is a flow through design and should be mounted...

Страница 22: ......

Страница 23: ...3 3 4 4 5 5 6 6 A A B B C C D D D10R Circuit Diagram A Ferero D Cover 23 11 2011 Designed by Checked by Approved by Date 1 1 Edition Sheet Date To TVE Fuel sol 86 87 87A 30 85 E Stop Float TVE from h...

Страница 24: ...STARTER SOL VE R1 WATER FLOAT SWITCH R3 R3 WATERFAULT LIGHT R2 OIL PRESSURE SWITCH ENGINEFAULT LIGHT H M Y FUEL SOL OIL PRESSURE SWITCH M START SOL Generator WATERFAULT LOCK OIL FAULT STARTER Wiring c...

Страница 25: ...de Company Name 2696 ThoroughClean Address 12 Ashburn Rd Bundamba QLD 4304 Telephone Fax Number Tel 07 5467 2025 Fax 07 5467 2026 Recommended Use Other Names Engine and Pump oil None Listed 2 HAZARDS...

Страница 26: ...d clothing and wash before reuse or discard If symptoms develop seek medical attention Eye If contact with the eye s occurs wash with copious amounts of water holding eyelid s open Take care not to ri...

Страница 27: ...ing drinking smoking or using toilet facilities Conditions for Safe Storage Store in a cool dry well ventilated area away from heat sources of ignition oxidising agents foodstuffs and clothing and out...

Страница 28: ...ratory Protective Devices and AS NZS 1716 Respiratory Protective Devices Eye Protection Safety glasses with side shields goggles or full face shield as appropriate recommended Final choice of appropri...

Страница 29: ...TABILITY AND REACTIVITY Chemical Stability Stable under normal conditions Conditions to Avoid Extremes of temperature and contact with incompatibles Incompatible Materials Strong oxidising agents such...

Страница 30: ...tis 12 ECOLOGICAL INFORMATION Ecotoxicity No ecological data available for this product Persistence Degradability This material is not expected to be readily biodegradable Mobility Not available Envir...

Отзывы: