© 2020 Thorlabs GmbH
2 Getting Started
7
2 Getting Started
2.1 Parts List
Inspect the shipping container for damage.
If the shipping container seems to be damaged, keep it until you have inspected the contents
and you have inspected the DC2200 mechanically and electrically.
Verify that you have received the following items within the package:
1. DC2200
2. Power Supply 100 - 240 V AC / 48 V 2.08 A DC
3. Custom Cable CAB-DC2200 to connect a custom LED to terminal LED1
4. Custom Cable CAB-LEDD1 to connect a custom LED to terminal LED2
5. USB 2.0 Cable
6. Quick Start Manual
2.2 Operating Elements
Front Panel
1
LED On / Off Button
2
Main Menu
3
Status Bar
4
Device Information Button
5
System Settings Button
Содержание DC2200
Страница 1: ...High Power LED Controller DC2200 Operation Manual 2020 ...
Страница 2: ...Copyright 2020 Thorlabs GmbH Version Date 1 6 23 Sep 2020 ...
Страница 26: ... 2020 Thorlabs GmbH 24 DC2200 Click I accept if you do so then Next to continue Click Next to continue ...
Страница 31: ... 2020 Thorlabs GmbH 3 Operating Instruction 29 Click Next and then Install to continue ...
Страница 70: ... 2020 Thorlabs GmbH 68 DC2200 6 2 Dimensions ...
Страница 74: ... 2020 Thorlabs GmbH 72 DC2200 6 7 Certifications and Compliances ...
Страница 78: ...www thorlabs com ...