background image

Trouble shooting

 

18 

PILOT TROUBLE SHOOTING 

CHECKING & CLEANING OF THE ODS INJECTOR: 

1. Visually check the orifice of the pilot injector 

if clogged, damaged or blocked.   If it cannot 
be  checked  visually,  try  to  blow    air  in  the 
injector and check if there is air coming out 
of the orifice. 

2. If the orifice is blocked or clogged, use an air 

blow  to  remove  the  clogging.    Never  pinch 
the  orifice  with  a  pin  as  this  could  damage 
the orifice. 

3. If the clogging cannot be removed from the 

orifice by air blow, replace the injector with 
a new one.  Remember to check the size of 
the orifice and replace with the same size. 

4. Follow the ODS injector removal procedure. 

FLAME DEVICE SYSTEM 

PILOT 

BURNER 

THERMO

COUPLE 

IGNITER 

ODS 

INJECTOR 

INSIDE PILOT 

NOTE:

      When  you  order  a  Flame  Device  System 

(FDS),  the  ODS  injector  is  not  included.    The  ODS 
injector can be ordered separately. 

PILOT 

TUBE 

FLAME DEVICE SYSTEM ODS INJECTOR REMOVAL: 

1. Shutdown  the  fryer.    Follow  the  complete 

shutdown procedure. 

2. Shut-off  the  main  isolation  valve  and  follow 

the lock-out/tag-out procedure. 

3. Let  the  fryer  cool  down  for  a  few  minutes 

before starting your work. 

4. Remove  the  mounting  screw  of  the  FDS 

Assembly, then remove the FDS Assembly. 

5. Disconnect the pilot tube from the FDS.  Use 

12mm spanner. 

6. Pull-out the pilot tube, then remove the ODS 

injector. 

7. Clean or replace the ODS injector if necessary. 
8. Make sure to check for gas leak, using soap & 

water, after part installation. 

Remove the mounting screw of the FDS 

Remove the ODS injector 

MOUNTING 

SCREW OF FDS 

ODS 

INJECTOR 

Содержание GH110-N

Страница 1: ...ors or liquids in the vicinity of this or any other appliances Keep the area free and clear of combustible WARNING Improper installation adjustment alteration service or maintenance can cause property...

Страница 2: ...OF CONTENTS PAGE Introduction 1 Specification 2 Dimensions 3 Installation 4 6 Operation 7 9 Cleaning and Maintenance 10 11 Troubleshooting 12 25 Conversion from NG to LPG and vice versa 25 Explosion D...

Страница 3: ...H READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS APPLIANCE WARNING INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE USER SMELLS GAS ARE TO BE P...

Страница 4: ...ruction Manual Gas Supply Requirements 2 The burner operating pressure is to be measured at the gas control valve outlet test point with one burner operating at High setting The operating pressure is...

Страница 5: ...Dimensions GH110 P GH110 N GH111 P GH111 N 3...

Страница 6: ...horized service agent They are not to be adjusted by the installation person Unpacking Remove all packaging and transit protection from the appliance including all protective plastic coating from the...

Страница 7: ...e and may void the warranty If applicable the vent line from the gas appliance pressure regulator shall be installed to the outdoors in accordance with local codes or in the absence of local codes wit...

Страница 8: ...level four ways across the front and rear of the fryer pot and along each edge Commissioning 1 Before leaving the new installation a Check the following functions in accordance with the operating inst...

Страница 9: ...pot with solid shortening 5 When solid shortening is used be careful not to bend break or twist the thin capillary wires of the sensing elements located in the fryer pot 6 Pack solid shortening into...

Страница 10: ...set the thermostat to the desired temperature Shut down Button Pizeo Ignitor Thermostat Pilot Position High Temperature Protection Reset button Ignition Button Shutdown Procedure Standby Turn thermos...

Страница 11: ...SPACE All burners are lit from constantly burning pilots Turning the valve to the desired flame height is all that is required to put the unit in service Do not permit fans to blow directly at the un...

Страница 12: ...any sediment remaining in the fryer pot with a little hot oil 4 Wipe off the basket support frame and the inside of the fryer pot with a clean cloth 5 Close drain valve and strain the oil back into t...

Страница 13: ...rubbing the surface with SCOTCH BRITE scouring pads or STAINLESS scouring pads DO NOT USE ORDINARY STEEL WOOL as any particles left on the surface will rust and further spoil the appearance of the fin...

Страница 14: ...ation listed on the name plate A mill voltage circuit diagram is located inside the front door of the fryer and also on page 18 CHECKING AND ADJUSTING MAIN BURNERS The main burners should burn with a...

Страница 15: ...around an appliance may lower oxygen content in the surrounding air This can be a result of spillage of combustion products into the room as well These conditions can cause incomplete combustion and...

Страница 16: ...also causes its problems Yellow tipping is one of them Flames will eventually become all yellow if no primary air is supplied These yellow tips are caused by glowing carbon particles in the flame Soo...

Страница 17: ...al manner UNSTABLE OR WAVERING FLAMES Drafts across burners may cause flames to waver or appear to be unstable This condition should not be confused with lifting or floating flames Wavering burner fla...

Страница 18: ...ermocouple is producing 20 30 millivolts Otherwise replace the FDS Follow the FDS removal procedure Faulty combination valve Replace the combination valve Follow the combination valve removal procedur...

Страница 19: ...y shaking or pounding baskets on top surface or by slamming door may cause Hi Limit Control Switch to open If this condition persists additional cushioning may be added to the rubber grommets supporti...

Страница 20: ...STEM PILOT BURNER THERMO COUPLE IGNITER ODS INJECTOR INSIDE PILOT NOTE When you order a Flame Device System FDS the ODS injector is not included The ODS injector can be ordered separately PILOT TUBE F...

Страница 21: ...ollow the burner removal procedure 5 Remove the FDS Assembly Follow the FDS Assembly removal procedure 6 Disconnect the pilot tube from the ODS injector Use 12mm spanner 7 Disconnect the other end of...

Страница 22: ...work 4 Disconnect the pilot tube from the ODS injector Use 12mm spanner 5 Disconnect the thermocouple from the combination valve Use 9mm spanner 6 Pull out to disconnect the igniter wire from the pie...

Страница 23: ...out of the burner hole at the bottom 9 Clean the burner or replace if necessary 10 Make sure to thoroughly dry the burner before re installing Loosen the two mounting screws of the burner BURNER INJEC...

Страница 24: ...Disconnect the outlet pipe adaptor from the combination valve 9 Remove the sensor probe from the fryer pot thru the bottom 10 Make sure to thoroughly dry the burner before re installing Remove the se...

Страница 25: ...Remove the wires on the High Temp Protector 8 Remove the burners on the side covering the sensor probe Follow the burner removal procedure 9 Remove the sensor probe from the fryer pot thru the bottom...

Страница 26: ...ting your work 4 Remove the three mounting screws of the bracket at the bottom of the fryer 5 Disconnect the igniter wire from the piezo igniter 6 Remove the piezo igniter lock nut then pull out the p...

Страница 27: ...n burner injector Follow the main burner injector removal procedure See table below for injector orifice size 9 Replace the pilot injector Follow the pilot injector removal procedure See table below f...

Страница 28: ...Explosion drawing 26 GH110 P GH110 N GH111 P GH111 N...

Страница 29: ...GH111 N GH110 N 01 20 1068571 1 7 Basket GH110 P GH110 N GH111 P GH111 N 01 10 1061027 2 8 Flue Rear GH110 P GH110 N GH111 P GH111 N 01 15 1066336 01 15 1066411 1 9 Injector Orifice GH110 N GH111 N 01...

Отзывы: