ThermoTec LCSPI-120 Скачать руководство пользователя страница 15

Page 14

RENEWABLE  HEATING & COOLING TECHNOLOGY

MAINTENANCE

 

To protect the paintwork, avoid leaning or putting objects on the shell. External Heat 
Pump parts can be wiped with a damp cloth and domestic cleaner. (Warning: Never use 
cleaning agents containing sand, soda, acid or chloride as these can damage the 
surfaces.)

To prevent blockages in the titanium heat exchanger, ensure that the system 
incorporates a water and filter treatment facility. In the event of a problem occurring due 
to contamination, the system should be cleaned as described below. (Warning: the fins 
on the finned tube heat exchanger are sharp!).

Cleaning the Heat Exchanger and Pipework

Contamination in the pipes and heat exchanger can reduce the performance of the heat 
pumps’ titanium heat exchanger. If this is the case, the pipe system and heat exchanger 
must be cleaned by a technician.
Use only pressurized drinking water for cleaning.

Cleaning the air system

The finned heat exchanger, fan and condensate outflow should be clear of all 
obstructions (leaves, twigs, etc.) before each new heating season. These can be 
manually removed using compressed air or by flushing with clean water.
It may be necessary to remove the unit cover and air inlet grid first.

Attention: Before opening the unit, ensure that all electrical supplies are isolated.

To prevent the evaporator and the condensate tray from being damaged, do not use hard 
or sharp objects for cleaning.
Under extreme weather conditions (e.g. snow drifts), ice may form on the air intake and 
exhaust air outlet grids. If this happens, the ice must be removed in the vicinity of the air 
intake and exhaust air outlet grids to ensure that the minimum air flow rate is maintained.

Winter Shutdown.

To prevent frost damage to the unit when not in use the Heat Pump should be drained of 
all water. Failing this another form of frost protection should be considered and actioned.

Attention: The warranty does not cover damage caused by inadequate frost 
protection measures during the winter.

TROUBLE SHOOTING

This section provides useful information for diagnosing and correcting certain prolems 
which may occur. Before starting the troubleshooting procedure, carry out a thorough 
visual inspection of the unit and look for obvious defects such as loose connections or 
defective wiring.
Before contacting your local dealer, read this chapter carefully.It could save you time 
and money.

Содержание LCSPI-120

Страница 1: ...RENEWABLE HEATING COOLING TECHNOLOGY Swimming Pool Heat Pump Enjoy longer swimming seasons with less cost Operation Installation Manual...

Страница 2: ...ONTENTS OVERVIEW OF THE UNIT INSTALLATION Installation guidelines Locating your Unit Water connection Electrical connection Trial running OPERATING THE UNIT Features and functions User interface Butto...

Страница 3: ...be used with all types of water treatment including chlorine iodine bromine and salt water Multiple functions Cooling and heating functions available Auto operation Auto restart Auto defrost Auto time...

Страница 4: ...pply If there is no suitable earthed supply available have one installed by a qualified electrician Do not move repair the unit yourself Before carrying out any maintenance service or repair work the...

Страница 5: ...OGY CONTENTS Before starting the installation please make sure that all items are found inside the box The Unit Box Item Image Qty Swimming pool heat pump 1 Operation and Installation Manual 1 Accesso...

Страница 6: ...RENEWABLE HEATING COOLING TECHNOLOGY OVERVIEW OF THE UNIT Page 5 LCSPI 120 150 170...

Страница 7: ...Page 6 RENEWABLE HEATING COOLING TECHNOLOGY EXPLODED VIEW...

Страница 8: ...ed to a solid wall Try to avoid placing the unit under a tree or exposed to extreme conditions Water connection The heat pump is connected to a filtration circuit with a by pass It is imperative that...

Страница 9: ...e supply cables Trial Running After connecting the unit to the pool system ensureyour installation is complete with a suitable by pass and electrical connections by a qualified engineer Be sure that 1...

Страница 10: ...THE BUTTONS OF THE DIGITAL CONTROLLER WITH A HARD POINTED OBJECT THIS MAY DAMAGE THE DIGITAL CONTROLLER NEVER INSPECT OR SERVICE THE DIGITAL CONTROLLER YOURSELF REFER TO A QUALIFIED SERVICE ENGINEER B...

Страница 11: ...tory parameter query interface factory parameter query password 0814 manufacturer setting password 8563 On factory parameter query interface screen press to enter into parameter setting interface pres...

Страница 12: ...wer off On Timer setting interface screen press to confirm current Timer settings and back to main operation interface Settings way for other groups of Timers is same as Timer 1 Timer 1 2 are for unit...

Страница 13: ...A10 Reserved E1 E6 Error code display Parameter settings User parameters can be adjusted by users Code Parameter Name Range Default L2 Outlet water temp variation for compressor start 2 25 5 L3 Outle...

Страница 14: ...No action needed Er 05 High pressure protection 1 Inadequate flow rate 2 Uncompressed gas in refrigerant system 3 Overcharge with refrigerant 4 Water temp setting too high 5 Poor connection of pressur...

Страница 15: ...ed using compressed air or by flushing with clean water It may be necessary to remove the unit cover and air inlet grid first Attention Before opening the unit ensure that all electrical supplies are...

Страница 16: ...sales service technician Work on the heat pump may only be carried out by authorized and qualified after sales service technicians ENVIRONMENTAL INFORMATION This equipment contains fluorinated greenh...

Страница 17: ...be treated at a specialized treatment facility for re use recycling and recovery By ensuring that this product is disposed of correctly you will help to prevent potential negative consequences for th...

Страница 18: ...Page 17 RENEWABLE HEATING COOLING TECHNOLOGY WIRING DIAGRAM Please refer to the wiring diagram on the electric box Model LSCPI 120 150 170...

Страница 19: ...Page 18 RENEWABLE HEATING COOLING TECHNOLOGY Model LCSPI 210 250 300...

Страница 20: ...Page 19 RENEWABLE HEATING COOLING TECHNOLOGY TECHNICAL SPECIFICATIONS...

Отзывы: