3.5.4  Using anti-freeze mixtures

It is not recommended to fill heating systems with anti-freeze mixtures due to their properties This generally concerns the 

decrease of the delivery of heat, large volume expansion, ageing and damage to the rubber parts of the boiler. 

!

 

3.5.5  Safety valve

In the lower part of the boiler is a safety valve. When operating the boiler, under certain circumstances, there can be penetration 

of water or escape of steam from the safety valve. Due to this reason it is recommended to install on the output of the safety 

valve suitable leakage which will terminate into the waste system.

Under no circumstances is it permitted to manipulate with the safety valve during operation of the boiler! 

 

3.6  Connection of the boiler to the gas distribution

The boiler must only be connected to gas by an authorized firm according to ČUBP Regulation and ČBU 21/1979 Coll. (as 

amended by Regulation 554/1990 Coll.) by employees with the qualification according to FMPE Regulation 175/1975 Coll. 

(as amended by FMPE Regulation 18/1986 Coll.) and according to the approved documentation for gas installation. It is not 

necessary to install the gas regulator before the boiler. It is contained in the compounded gas fitting which is part of the boiler. 

In the boiler input there must be a ball valve with the respective attestation for gas. The gas closure must be freely accessible.
The boiler is designated for operation with natural gas with caloric capacity 9 – 10,5 kWh/m

3

 and a nominal pressure in the 

distribution network of 20 mbar.

!

After the termination of the assembly of the gas lines to the boiler, it is necessary to consistently check the 

tightness of all joints!

 

3.7  Filling and discharging of the heating system

When filling the heating system the boiler must be disconnected from the electricity network by disconnecting the fork from 

the socket. Filling must be done slowly so that the air can flow through the respective de-aerating valves. The water for the 

first filling and for additional filling must be according to ČSN 07 7401 clear, without colour, without suspended substances, 

oil and chemically aggressive ingredients, must not be acid (pH must not be lower than 7), with minimum carbonate hardness 

(max. 3.5 mval/l). For modification of the hardness, it is necessary to use preparations approved by producer.

 

3.7.1  Procedure for filling the heating system:

1.  check and adjust the pressure in the expansion vessel according to the stated static pressure in the system.
2.  open the charging valve of the heating system and on the manometr monitor the increasing pressure in the heating 

system

3.  After filling the heating system, the pressure should be within the range 1.0 – 1.5 bar
4.  carefully de-aerate all radiators (during the circulation of water no air bubbles should be heard)
5.  check the water pressure in the system again – after de-aeration it will probably be to pressurize the heating system
6.  Check that the de-aerating valves on the heating bodies are closed
7.  Before activating the boiler, it must be de-aerated

If these requirements are not fulfilled, the warranty for damaged components will no be applicable.

 

3.7.2  Additional filling of water into the heating system

The additional filling of water into the system is described in the Chapter "Maintenance and Service" and in the 

„User 

Manual“

part.

 

3.7.3  Discharging of water from the heating system

The full discharging of water from the whole heating system must be resolved by the system discharging valve located in the 

lowest point of the heating system.

Содержание THERM 90 KD.A

Страница 1: ...Manual for installation operation and maintenance of boiler Hanging gas condensing boiler THERM 90 KD A...

Страница 2: ...THERM 90 KD A Manual for installation service and maintenance of boiler...

Страница 3: ...Complete character of the delivery 19 3 3 Location of the boiler 20 3 4 Suspending the boiler 20 3 5 Connecting the boiler to the hot water system 21 3 5 1 Dimensions and connection 21 3 5 2 Graphs of...

Страница 4: ...res to maintain the minimum pressure of the water in the heating system of 0 8 bar measured in cold state With regard to their power and use variability the THERM 90 KD A boilers are not fitted with e...

Страница 5: ...al to the volume of air through the mixer delivered with the ventilator Therefore it can be stated that the output on the boiler depends on the volume of the air flow for combustion As a result the re...

Страница 6: ...gases disconnect the boiler ensure ventilation of the room windows door call service the boiler must not be used until after the service inspection In the case of a consumer appliance fire close the g...

Страница 7: ...Temperature of glue gases in overheated condition C 82 Lower flue gas temperature at minimum thermal power C 25 Weight flow of burnt gases g s 1 10 2 42 8 Weight flow of flue gases at minimum thermal...

Страница 8: ...et of boiler THERM 90 KD A 1 Condensing chamber 2 Ventilator 3 Heating temperature probe 4 Mixer 5 Emergency thermostat 6 Circulation pump 7 Gas valve 8 Safety valve 9 Control panel 10 Pressure switch...

Страница 9: ...ummer regime only heating of DHW is ON the heating is OFF Winter regime heating and heating of DHW is ON Unblocking the failure status of the boiler Service mode the function sweeper the output of the...

Страница 10: ...er the termination of the setting the indication of the set temperature remains for about 5 seconds The following permanent display of the numeric value and the symbol the real temperature of the resp...

Страница 11: ...rface of the cascade is active Description of symbols shown on the display 2 1 3 Information menu Buttons and are used for entrance and bi directional browsing in the information menu in the following...

Страница 12: ...is attached to the product The procedure for the first ignition of the boiler is as follows set the rotary button of the input temperature of the heating water of the boiler to the maximum insert the...

Страница 13: ...least a simple room thermostat The room temperature is time stable and keeps the boiler in the operating regimes It is recommended to use the built in equitherm regulation either in dependently or com...

Страница 14: ...we recommend not to mount thermostatic heads on radiators in the reference room at all 2 3 3 Operation of the boiler using built in equithermal regulation This regime is accessible in the boiler in t...

Страница 15: ...nds to the shift of the curve 0 C After inspection of the temperature of the heated space after approximately 24 hours it is possible to perform additional setting according to all requirements for th...

Страница 16: ...ked In the case of any increase above 86 C the burning is stopped and circulating pump remains active The reignition is in the case of a decrease of the temperature under 80 C The working phase of the...

Страница 17: ...stat within the range 0 10 minutes may only be performed by an authorized service technician Notification All the above mentioned security and registered functions are in activity only if the boiler i...

Страница 18: ...s by rough handling for damage caused by unprofessional intervention into the electronic system during the adjustment and connection of the add in regulation for damages caused by the use of other par...

Страница 19: ...ol on the commissioning of THERM products into operation 6 Application for registration into the prolonged warranty programme 7 Confirmation of completing 1 and 2 service inspection 8 Hanging bar incl...

Страница 20: ...hane polystyrene polyethylene PVC etc The safe distance between flammable items and the boiler is 50mm from the chimney flue and the control hole 200mm Flammable items must not be located at lower dis...

Страница 21: ...m Due to the optimal use of the condensing regime of the boiler it is recommended to design heating systems for low temperatures t 50 30 C The minimum overpressure of the system is 0 8 bar We recommen...

Страница 22: ...0 Heating systems in buildings Design and assembly The producer requires mount into the slides of the pump filter and de sludge equipment e g Spirovent Kal mount a bypass valve in heating systems with...

Страница 23: ...ss of all joints 3 7 Filling and discharging of the heating system When filling the heating system the boiler must be disconnected from the electricity network by disconnecting the fork from the socke...

Страница 24: ...ases of these types of boilers must be designed by means of the certificate smoke collection system delivered by the producer From the viewpoint of checking the route for burnt gases it is necessary t...

Страница 25: ...t has voltage free contact can be used i e no other voltage is supplied into the boiler It is necessary to connect the room thermostat to the boiler by a two core conductor The recommended cross secti...

Страница 26: ...must not be grounded to the body in several places For example a SYKFY cable is recommended Construction C 13 axial horizontal variant with termination to the peripheral wall The piping can be double...

Страница 27: ...tart and mixture ration are adjusted by the service technician during start up of the boiler by means of the flue gas analyser The gas fitting is set exclusively by an employee of the authorized servi...

Страница 28: ...28 THERM 90 KD A 4 2 Electrical connection diagram...

Страница 29: ...er alloys are collected into the sorted metal collection units The thermal insulation of the combustion chamber is harmless to health and is disposed of in common communal wastes For storage it is nec...

Страница 30: ...n burner power consumption Pign kW In standby mode PSB kW Emissions of nitrogen oxides NOx mg kWh Sound power level indoors LWA dB For combination heaters Water heating energy efficiency class Water h...

Страница 31: ...Slovak Republic EC notified body identification number 202 THERM 90 KD A Certificate of testing of the model according to the EC Directive for consumer appliances for gas fuel 2009 142 EEC No E 30 01...

Страница 32: ...THERMONA spol s r o Star osada 258 664 84 Zast vka u Brna 420 544 500 511 FAX 420 544 500 506 thermona thermona cz www thermona cz THERMONA 2016 09 2016...

Отзывы: