14 

 

2. HSW tank heating mode (17 KDZ and 17 KDZ5) 

Setting: Service switch DS1 – OFF, DS2 as mentioned before, DS3 – OFF. 

  

The  work  cycle  of  this  boiler  mode  starts  when  the  tank  thermostat  is  activated.  The  intercepting  valve 

relay  becomes  activated  and  changes  over  to  the  HSW  tank  heating  position.  After  roughly  8  seconds, the pump 

and  automatic  ignition  system  start  operating.  The  boiler  ignites  at  the  initial  output  (10  seconds  after  the  boiler 

ignition)  and  consequently  increases  the  output  to  maximum  in  order  to  raise  the  output  temperature  to  80°C  as 

soon  as  possible.  This  temperature  is  maintained  by  means  of  the  PID  type  output  regulation.  When  the  tank  is 

warm enough, the thermostat becomes disconnected and the combustion in the boiler stops. The pump stops after 

10 seconds and turns off the intercepting valve relay which forces it to return back into the heating position. While 

the valve is changing over to the other position (approx. 8 seconds), any request for ignition will be ignored. The 

boiler can subsequently continue in the heat-up of the heating system (depending on the setting). 

  

In the case of concurrent requests, HSW tank heating has preference over the heating system. 

 
Additional functions: 

 

After  the  boiler  combustion  stops,  the  ventilator  continues  running  for  further  20  seconds  at  the  speed  of  the 

initial output (removal of the combustion product from the combustion chamber). 

 

Regular pump start-up if boiler does not operate (for 30 seconds after 24 hours of inactivity). 

 

Regular contact making of the intercepting valve (for 10 seconds after 24 hours of inactivity) 

 

Anti-freeze  protection  becomes  activated  if  the  temperature  in  the  boiler  drops  below  6°C.  The  intercepting 

valve changes over into the heating position (depending on the boiler type), the pump starts up and the boiler 

ignites and heats up the heating circuit to 30°C. After this temperature is reached, it turns off. 

 

Repeated  control  of  the  flow  switch  becomes  activated  if  the  flow  switch  does  not  make  a  contact  within  15 

seconds  of  the  pump's  operation.  The  pump  stops  operating  after  45  seconds  and  another  attempt  for  boiler 

activation is made. This is repeated 10 times. The boiler must be then turned off and on by the operating mode 

knob.  If  the  pump  inactivity  time  exceeded  30  minutes,  the  first  interval  of  the  pump  operation  becomes 

extended to 180 seconds. Intervals between the attempts are indicated according to the following table of error 

indication. 

 

 A service engineer authorized by the manufacturer is obliged to make the user demonstrably familiar with 
the boiler operation, its individual parts, safety devices and boiler operation, complete the letter of guarantee 
and hand over this manual for operation. 
 

The  user  is  obliged  to  observe  correct  use  of  the  boiler  in  line  with  this  manual  which  is  a  condition  for  the 

acknowledgement of the warranty. It is also strictly forbidden to interfere with any of the secured components in 

the boiler. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Therm 17 KD

Страница 1: ...Instructions for installation and use of condensing boilers Therm 17 KD KDZ KDZ 5...

Страница 2: ...NS FOR OPERATION AND MAINTENANCE 10 BOILER OPERATION 10 7 MODULATING ELECTRONICS DIMS03 TH01 12 8 GAS FITTING SIT 848 SIGMA 15 9 WARRANTY AND RESPONSIBILITY FOR DEFECTS 16 10 GRAPH OF POSSIBLE HEATING...

Страница 3: ...LERS THERM 17 KD gas boiler is composed of a carry frame to which all operational components of the boiler are attached Giannoni compact condensing body which conjugates the combustion chamber and bur...

Страница 4: ...ored by a flow switch integrated in the multi purpose GRF 3 collector together with the bypass valve for charging the heating system from the service water inlet or potentially from an external connec...

Страница 5: ...0 Diameter of the coaxial venting mm 60 100 60 100 60 100 Mean combustion product temperature o C 50 50 50 Combustion product flow by weight natural gas g s 1 2 1 9 8 2 1 9 8 2 1 9 8 Max noisiness acc...

Страница 6: ...the ambient temperatures within the range of 5 to 35 C and maximum relative humidity of 80 Objects in the sense of Czech standard SN 06 10 08 classified according to Czech standard SN 73 08 23 must n...

Страница 7: ...er expansion vessel capacity it is necessary to install another expansion vessel in the system CONDENSED WATER DRAINAGE The boiler is fitted with a running trap syphon which must be filled with approx...

Страница 8: ...luding the outlet distance pieces piping fittings designed for the supplied boiler type These boiler components are supplied separately depending on the type and concrete installation conditions the b...

Страница 9: ...re regulation e g Honeywell CM 707 CM 907 or Electrobock PT 21 PT 30 etc An outdoor THERM Q01 sensor is supplied by Thermona for an expedient equitherm regulation An intelligent THERM RC 03 programmab...

Страница 10: ...persons over 18 years of age Service buttons are designed for boiler diagnostics and parameter settings Heating temperature setting regulator for user setting of the output temperature of water in the...

Страница 11: ...setting is finished the set temperature value will be indicated for the following roughly 5 seconds The actual temperature of the respective operating mode is indicated by the subsequent permanent dis...

Страница 12: ...1 HSW DS2 outdoor sensor DS3 cascade DS4 DS5 DS6 OFF tank without the outdoor sensor slave ON flow with the outdoor sensor master Default setting DS1 depends on the boiler type DS2 OFF mode 1 1 DS3 OF...

Страница 13: ...n of the equitherm curve displacement in the range of 15 C of the heating water by the heating water temperature regulator on the control panel The equitherm curve is modified for a standard heating s...

Страница 14: ...m the combustion chamber Regular pump start up if boiler does not operate for 30 seconds after 24 hours of inactivity Regular contact making of the intercepting valve for 10 seconds after 24 hours of...

Страница 15: ...output i e minimum ventilator speed is already set By tightening the screw the amount of gas in the mixture increases 2 Setting the air gas mixture ratio To do this use the regulatory screw of the gas...

Страница 16: ...llation of the el voltage chiefly excess voltage peaks gas pressure and purity etc defects of the appliances outside the boiler which affect its function inappropriate venting impurities in the combus...

Страница 17: ...ssure of THERM 17 KDZ 17 KDZ 5 0 0 50 0 100 0 150 0 200 0 250 0 300 0 350 0 400 0 450 0 500 0 0 4 0 6 0 8 1 1 2 Water flow m3 h Outlet over pressure mbar Wilo 3 Grunfos 3 Warning The curves of possibl...

Страница 18: ...18 11 El diagram of THERM 17 KD connection with the DIMS03 TH01 automatics...

Страница 19: ...19 12 El diagram of THERM 17 KDZ KDZ 5 boilers connection with the DIMS03 TH01 automatics...

Страница 20: ...40997 Grundfos pump st No 41367 Syphon st No 21059 1 Conjugated fitting GRF 3 st No 26072 Safety valve st No 40302 Ventilator RG130 0800 3612 031111 st No 42195 Mixer AGU3 645 A 109 st No 42197 Blocki...

Страница 21: ...ansion vessel st No 22168 Transformator 220V 24V st No 24477 Gas valve SIT st No 40997 Grundfos pump st No 41367 Siphon st No 21059 1 Conjugated fitting GRF 3 st No 26072 Safety valve st No 40302 16 T...

Страница 22: ...tor 220V 24V st No 24477 Mixer AGU3 645A109 st No 42197 Ventilator RG130 0800 3612 st No 42195 Safety thermostat st No 40035 Gas valve SIT st No 40997 Three way valve st No 21053 Grundfos pump st No 4...

Страница 23: ...71 90 100 80 177 O60 425 800 160 800 1 Recuperative water inlet G 3 4 external thread 2 Heating water outlet 3 Gas inlet G 1 2 external thread 4 Service water inlet G 1 2 external thread 5 Service wat...

Страница 24: ...either concentric or located in such small distance within 50cm that it is subject to the same meteorological conditions C43 Separate connection to the two pipes of a common shaft The outlet can be ei...

Страница 25: ...ompliant with the requirements specified in Section 10 of the Act No 185 2001 Coll and Section 6 of the Act No 477 2001 Coll The product package is normally disposed of in a scrap paper collecting cen...

Страница 26: ...o the EC notified body No 1015 THERM 17 KD THERM 17 KDZ THERM 17 KDZ 5 test certificate of type according to the EC Directive on appliances burning gaseous fuel 90 396 EEC No E 30 00571 07 as of Augus...

Отзывы: