1. Place the instrument on a level and
firm surface, it must be capable of
supporting the weight and load of the
instrument, and the impact force
generated by the motion. Prepare
related parts (see Figure 1-1).
2. Install the horizontal universal
platform on the fixed plate of the Main
body, ensure all four mounting holes
in the universal platform and the four
threaded mounting holes are in
alignment.
3. Fasten the universal platform and the
fixed plate with four M4x14 cross
recessed countersink head screws.
1.
Place the instrument on a level and
firm surface, it must be capable of
supporting the weight and load of the
instrument, and the impact force
generated by the motion. Prepare
related parts (see Figure 1-2).
2. Install the horizontal universal
platform on the fixed plate of the Main
body, ensure all four mounting holes
in the universal platform and the four
threaded mounting holes are in
alignment.
3. Fasten the universal platform and the
fixed plate with four M4x14 cross
recessed countersink head screws.
1) M4x14 cross recessed countersink
head screws
2) Universal (aluminum) platform
3) Main body of CO2 resistant shaker
1) M4x14 cross recessed countersink
head screws
2) 18inch (aluminum) platform
3) Main body of CO2 resistant shaker
3 Section 1 | Unpacking and Installation
1.2 Universal (Aluminum) Platform Installation
1.4 Rubber Mat Platform Installation
1.5 Connections of the Instrument
1.3 18inch (Aluminum) Platform Installation
Figure 1-1
Figure 1-3
Figure 1-2
①
①
②
②
③
③
1) Rubber mat
2) M4x10 cross recessed countersunk
head screws
3) Platform
4) Main body of CO2 resistant shaker
Note:
1) When disconnecting the control box from
the main body, please cut off the power
first.
▲
2) No special cable needed to connect with
4-20mA data port.
▲
1. Place the instrument on a level and
firm surface, it must be capable of
supporting the weight and load of the
instrument and the impact force
generated by the motion. Prepare
related parts (see Figure 1-3).
2. Install the horizontal platform on the
fixed plate of the Main body, ensure all
four mounting holes on the platform
and the four threaded mounting holes
are in alignment.
3. Fasten the platform and the fixed plate
with four M4x10 cross recessed
countersink head screws.
4. Place the rubber mat on the platform.
1) Main body of CO2 resistant shaker
2) Control box
3) Power adapter
4) Power cord
5) 4-20mA data port
Refer to Figure 1-4 when connecting the instrument.
①
②
③
④
Figure 1-4
⑤
①
③
④
②
MaxQ 2000 CO2 Plus 4
88881122B
88881122
88881123
88883101
2M
0.4M
88881181