4-14
DB-066 E
RadEye PRD-ER
Iw/Tr/Ff 06.07.2015
When the message “Place adapter” appears, place the Lu-
adapter.
The test runs for 120s. The remaining time is shown in the
display. If the deviation is greater than ±3V a second test run
is initiated automatically.
After testing the result is displayed. A successful test ends
with the query whether the user wants to accept the result.
If the high voltage is outside of adjustment range the message
“Inspection” is displayed. In this case the instrument should be
send to Thermo Fisher
Scientific Messtechnik GmbH, Service Center for inspection.
Successful Lu-Test
Failed Lu-Test
Содержание RadEye PRD-ER
Страница 2: ......
Страница 16: ......
Страница 24: ......
Страница 38: ......
Страница 60: ......
Страница 80: ......
Страница 90: ......
Страница 104: ......
Страница 116: ......
Страница 118: ...12 2 DB 066 E RadEye PRD ER Iw Tr Ff 06 07 2015 12 2 Flow Diagram Background Learning Alarming...
Страница 122: ......
Страница 123: ......